RENCANA ANGGARAN BIAYA PROGRAM KEGIATAN PEKERJAAN KECAMATAN TAHUN
: : : : :
PENYEDIAAN DAN PENGOLAHAN AIR BAKU PEMBANGUNAN SUMUR-SUMUR AIR TANAH PEMBANGUNAN SUMUR BOR & MCK DESA PASIE JEUMPA KAWAY XVI 2009
NO.
URAIAN PEKERJAAN
VOLUME
ANALISA
1 A. 1 2 3 4 5
2 PEKERJAAN PERSIAPAN Pengukuran/Utilizet Mobilisasi, Demobilisasi Peralatan dan Transportasi Bahan Papan Nama Proyek Pondok Kerja Foto Dokumentasi/istrasi
3
4
B. 1 2 3 4 5
PEKERJAAN SUMUR BOR Sumur Bor 1 1/2" Pompa Otomat 150 watt Pipa Besi Galvanis 3/4" + ris Box Pengaman Pompa Pemompaan Uji
-
-
HARGA SATUAN (Rp.) 5
Taksir Taksir Taksir Taksir Taksir
JUMLAH HARGA (Rp.) 6
238,000.00 3,563,000.00 333,000.00 713,000.00 475,000.00
238,000.00 3,563,000.00 333,000.00 713,000.00 475,000.00 5,322,000.00
Total A 1.00 1.00 1.00 -
Unit Bh Ls Unit Ls
Taksir Taksir Taksir Taksir Taksir
14,250,000.00 1,425,000.00 2,613,000.00 760,000.00 3,420,000.00 Total B
14,250,000.00 1,425,000.00 2,613,000.00 760,000.00 3,420,000.00 22,468,000.00
PEKERJAAN MEMBANGUN BARU MCK I. PEKERJAAN TANAH 1 Galian Tanah 2 Urugan Kembali 3 Urugan Tanah Bawah Lantai
5.50 1.37 5.40
M3 M3 M3
Anl. A.1 Anl. A.1 Anl. A.18.b
28,175.00 28,175.00 93,350.00 Sub Total I
154,962.50 38,599.75 504,090.00 697,652.25
II. PEKERJAAN PASANGAN DAN BETON Pondasi Menerus Pondasi Tapak Beton Bertulang Sloof 30/25 Kolom 13/13 Kolom 22/30 Ring Balk 13/15 Ring Balk 20/30 Plat Lantai Beton Bertulang Pasangan Bata 1: 2 Plesteran Dinding 1: 4 Lantai Keramik 30 x 30 Lantai Keramik WC 20 x 20 Dinding Keramik 20 x 25 Lantai Beton Tumbuk
8.00 1.20 2.10 0.10 2.25 0.15 1.80 2.87 9.10 141.42 35.71 6.20 64.45 28.00
M3 M3 M3 M3 M3 M3 M3 M3 M3 M2 M2 M2 M2 M2
Anl. G.32h Anl. Supl.V Anl. Supl.V Anl. Supl.V Anl. Supl.V Anl. Supl.V Anl. Supl.V Anl. Supl.Va Anl. G.33h Anl. G.50k Anl. Supl.IIIa Anl. Supl.IIIc Anl. Supl.IVa Anl. G.67
654,132.60 2,720,414.00 2,720,414.00 2,720,414.00 2,720,414.00 2,720,414.00 2,720,414.00 2,912,219.00 854,025.80 23,194.20 108,859.35 117,318.02 117,023.02 61,170.20 Sub Total II
5,233,060.80 3,264,496.80 5,712,869.40 272,041.40 6,120,931.50 408,062.10 4,896,745.20 8,358,068.53 7,771,634.78 3,280,123.76 3,887,367.39 727,371.72 7,542,133.64 1,712,765.60 59,187,672.63
13.00 2.00 4.00 7.50 6.00 6.00 6.00
Ttk Bh Bh M' Ttk Bh Bh
Taksir Taksir Taksir Taksir Taksir Taksir Taksir
76,000.00 124,000.00 29,000.00 119,000.00 114,000.00 48,000.00 33,000.00 Sub Total III Total C
988,000.00 248,000.00 116,000.00 892,500.00 684,000.00 288,000.00 198,000.00 3,414,500.00 63,299,824.88
3.39 0.40 6.65
M3 M3 M3
Anl. A.1 Anl. A.18b Anl. A.18b
28,175.00 93,350.00 93,350.00 Sub Total I
95,513.25 37,340.00 620,777.50 753,630.75
0.74 1.98 1.81 0.19 10.15 13.84
M3 M3 M3 M2 M2 M'
Anl. A. 18d Anl. G. 41 Anl. G. 43 Anl. G. 50h Anl. G. 67 Taksir
222,470.00 713,454.00 609,050.00 33,568.80 61,170.20 143,000.00 Sub Total II
164,627.80 1,412,638.92 1,102,380.50 6,378.07 620,877.53 1,979,120.00 5,286,022.82
C.
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7
D.
III. PEKERJAAN SANITASI DAN ELEKTRIKAL Kran Air + Perpipaan dan ris Closet Jongkok + Pipa Floor Drain Saluran Buangan Air Kotor dan Air Wudhu Titik Lampu + Instalasi Listrik Bola Lampu Saklar
PEKERJAAN HIDRANT UMUM 1 (SATU) UNIT
I. PEKERJAAN TANAH 1 Galian Tanah Pondasi 2 Pasir Urug 3 Tanah Urug Isian Dalam Pondasi
1 2 3 4 5 6
II. PEKERJAAN BETON DAN PASANGAN Pas. Batu Kosong Pondasi Beton Cor 1 : 2 : 3 Beton Dudukan Lantai Air 1 : 3 : 5 Plasteran Trasraam 1 : 2 Beton Rabat 1 : 3 : 5 Saluran Beton Buang Air
1
1 2 3 4
2 III. PEKERJAAN PENGADAAN DAN PEMASANGAN WATER TANK DAN RIS Water Tank 3000 Liter Pipa Besi Galvanis 3/4" + ris Pipa PVC 3/4" + ris Kran Air + ris
1 2 3 4 5 6 7
IV. PEKERJAAN LAIN-LAIN Septic Tank + Rembesan Kusen Pintu WC Bovenlight Daun Pintu Fiber Relief Plat Lantai Mengecat Dinding Water Tank 3000 Liter
3
4
5
6
1.00 10.00 75.00 6.00
Bh M' M' Bh
Taksir Taksir Taksir Taksir
3,325,000.00 105,000.00 24,000.00 48,000.00 Sub Total III
3,325,000.00 1,050,000.00 1,800,000.00 288,000.00 6,463,000.00
1.00 2.00 4.00 2.00 18.00 141.40 1.00
Unit Bh Bh Set M M2 Bh
Taksir Taksir Taksir Taksir Taksir Anl. G. 53a Taksir
2,375,000.00 214,000.00 119,000.00 333,000.00 119,000.00 8,109.00 3,325,000.00 Sub Total IV Total D
2,375,000.00 428,000.00 476,000.00 666,000.00 2,142,000.00 1,146,612.60 3,325,000.00 10,558,612.60 23,061,266.17
Rp. Rp. Rp. Rp.
5,322,000.00 22,468,000.00 63,299,824.88 23,061,266.17
Rp. Rp.
114,151,091.05 114,150,000.00
REKAPITULASI : A. B. C. D.
PEKERJAAN PERSIAPAN PEKERJAAN SUMUR BOR PEKERJAAN MEMBANGUN BARU MCK PEKERJAAN HIDRANT UMUM 1 (SATU) UNIT Jumlah Total Dibulatkan
Terbilang : Seratus Empat Belas Juta Seratus Lima Puluh Ribu Rupiah
Meulaboh, 14 April 2009 Penawar, CV. RAHMAD
RAHMAD IRMAYUDI, SE Direktur
HARGA PERKIRAAN SENDIRI (HPS) OWNER ESTIMAT KEGIATAN PENGEBORAN AIR TANAH TAHUN 2015 NO A.1 1 2 3 A.2 1 2 3 4 5 6 7 8 9 10 11 12
JENIS ITEM Mobilisasi dan Demobilisasi Sewa Truck Solar Pekerjaan Pengeboran Peralatan bor 1 lubang @45Meter;2" Setup dan de-setup rig Upah Buruh harian @5 orang Upah Juru bor Harian @1 orang Upah Supervisor lapangan @1 orang Polimer Grease Solar Pipa Galvanis 2" @6 Meter Gravel Beton Pelindung Sumur
PERKIRAAN KUANTITAS SATUAN
HARGA SATUAN
SENDIRI (HPS) OWNER ESTIMATE (OE) N PENGEBORAN AIR TANAH TAHUN 2015 ITEM
SUB TOTAL A.1
B.2
Merk
ACCESSORIES BOR 1 Bearing bor 2 3 4 5 6 7 8 PLUMBING 1; GALVANIS 1 Pipa Galvanis 2" 2 Pipa Galvanis 3"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 1
PLUMBING 2; PARALON Tandon 1100 L Penguin Dop 3/4" (katup bawah tandon) Lbo 3/4" Water Mur 3/4" Klem selang Isolasi Putih Pipa Paralon 3/4" AW @3 Met Wavin Reducer 1" - 3/4" Maspion Reducer 1 1/2" - 1" Maspion
PEMBESIAN Besi Siku 5x5 Besi Plat 6x1m @1 Lembar Jaring Kawat Fernes Besi batangan 2x4
HARGA SATUAN 30,000
550,000 900,000
1,900,000 5,000 10,000 20,000 4,000 30,000 30,000 4,000 6,000
195,000 950,000 175,000 95,000
2 ELECTRICAL 3 Isolasi Hitam 4 Kabel Tembaga @1M Colokan Double Colokan Kabel Listrik Colokan Rumah Listrik Bohlan 24W
5,000 10,000 Philips
45,000
SUMBER I
SUMBER II
Bengkel Fajar Angaya SP II
Toko Serba guna Yos Sudarso (Gunawan)
Toko UD Kartika Jaya SP II Toko UD Kartika Jaya SP II Toko UD Kartika Jaya SP II Toko Aditama Toko Aditama Toko Aditama
Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan)
Toko SP II Toko SP II Toko SP II
HARGA PERKIRAAN SEND KEGIATAN PEN TA NO A.1 1 2 3 4 5 6 A.2 1 2 3 4 5 6 7 8 9 11 A.3 1 2 3
A A.4
1 2 3 A.5 1 2 3 4 5 A.5 1 2 3 A.6 1 2 3 4 5 6
B
B.1 B.2 B.3
JENIS ITEM
PERKIRAAN KUANTITAS
SATUAN
Pekerjaan Lapangan Mobilisasi, Demobilisasi; Transportasi OH 8 Upah Buruh harian @5 orang Trip 10 Sewa Truck Liter 35 Solar Hari 30 Sewa Kendaraan Roda 4 @1 Buah Hari 30 Sewa Kendaraan Roda 2 @1 Buah Liter 100 Bensin Pekerjaan Pengeboran Meter 45 Peralatan bor 1 lubang @45Meter; 2" LS 1 Setup dan de-setup rig Hari 30 Upah Buruh harian @5 orang Hari 30 Upah Juru bor Harian @1 orang Hari 30 Upah Supervisor lapangan @1 orang Galon 5 Polimer Kaleng 2 Grease Liter 100 Solar Buah 8 Pipa Galvanis 2" @6 Meter Gravel Pekerjaan Pembersihan Sumur LS 1 Pembersihan Sumur Bor Hari 2 Upah Buruh harian @5 orang Hari 2 Upah Supervisor lapangan @1 orang Pekerjaan Konstruksi Sumur Upah Buruh harian @5 orang Hari 2 Sak 10 Semen Rate 0.5 Pasir Pekerjaan Pemasangan Pipa Upah Buruh harian @5 orang Hari 3 Pipa Paralon AW 3/4" @4M Meter 40 Buah Elbow 3/4" 20 Buah 4 Water Mur 3/4" Buah 5 Keran Air Pekerjaan Rehab Menara Air @1100Lx8 Upah Buruh harian @5 orang Hari 10 Pekerjaan Rehab Menara Air Buah 1 Replace Tangki @1100Lx8 Buah 8 Pekerjaan Kelistrikan Upah Buruh harian @5 orang Hari 5 Isolasi Hitam Buah 3 Kabel Tembaga @1M Meter 40 Colokan Double Buah 1 Colokan Kabel Listrik Buah 2 Pipa Paralon 1/2" AW @4 Meter Meter 40 Pekerjaan Pembuatan Laporan Laporan Pendahuluan Buku 10 Laporan Akhir Buku 10 Biaya Komunikasi Kantor Utama Proyek Bulan 1
B B.4 B.5 B.6
C
D
E F
C.1 C.2 C.3 C.4 C.5 C.6 C.7 C.8 C.9 D.1 D.2 D.3 D.4 D.5
Biaya Komunikasi Lapangan Bulan 2 Biaya ATK Bulan 1 Biaya Tenaga Ahli Bulan 2 Pekerjaan Pembangunan Filter Air Biaya Buruh Harian @5 Orang Hari 5 Filter Mangan Buah 8 Filter Silika Buah 8 Filter Ferrolite Buah 8 Filter Karbon dan UV Buah 8 Biaya Uji Kualitas Air Bersih Sampel 10 Biaya Pembuatan Rangka Filter Air Buah 1 Pompa Air dari Sumur ke Filter Buah 1 Pompa Air dari Filter ke Tangki @1100L x 8 Buah 1 Biaya Penentuan Titik Sumur Bor Biaya Sewa Alat Survey LS 1 Biaya Ahli Hidrologi @1orang Hari 1 Upah Buruh Harian @3orang Hari 10 Biaya Pembuatan Gambar LS 1 Biaya Survey Lokasi Hari 10 Keuntungan ~ 0 PPN 10%
HARGA PERKIRAAN SENDIRI (HPS) OWNER ESTIMATE (OE) KEGIATAN PENGEBORAN AIR TANAH TAHUN 2015 HARGA SATUAN
SUB TOTAL
ITEM
angan ortasi
A.1 200,000 750,000 6,900 750,000 200,000 7,300
8,000,000 7,500,000 241,500 22,500,000 6,000,000 730,000
400,000 3,000,000 200,000 500,000 550,000 1,450,000 250,000 6,900 550,000
18,000,000 3,000,000 30,000,000 15,000,000 16,500,000 7,250,000 500,000 690,000 4,400,000
B.2
ACCESSORIES BOR 1 Bearing bor 2 3 4 5 6 7 8 PLUMBING 1; GALVANIS 1 Pipa Galvanis 2" 2 Pipa Galvanis 3"
ur 2,000,000 200,000 550,000
2,000,000 2,000,000 1,100,000
200,000 85,000 700,000
2,000,000 850,000 350,000
200,000 45,000 10,000 20,000 50,000
3,000,000 1,800,000 200,000 80,000 250,000
200,000 10,000,000 2,000,000
10,000,000 10,000,000 16,000,000
200,000 3,000 5,000 100,000 10,000 30,000
5,000,000 9,000 200,000 100,000 20,000 1,200,000
180,000 180,000 5,700,000
1,800,000 1,800,000 5,700,000
r
a
00Lx8
120
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 1
PLUMBING 2; PARALON Tandon 1100 L Dop 3/4" (katup bawah tandon) Lbo 3/4" Water Mur 3/4" Klem selang Isolasi Putih Pipa Paralon 3/4" AW @3 Met Reducer 1" - 3/4" Reducer 1 1/2" - 1"
PEMBESIAN Besi Siku 5x5 Besi Plat 6x1m @1 Lembar Jaring Kawat Fernes Besi batangan 2x4
2,300,000 5,900,000 20,000,000
4,600,000 5,900,000 40,000,000
200,000 2,000,000 2,000,000 1,000,000 1,000,000 3,000,000 20,000,000 9,000,000 450,000
5,000,000 16,000,000 16,000,000 8,000,000 8,000,000 30,000,000 20,000,000 9,000,000 450,000
30,000,000 20,000,000 200,000 10,000,000 1,000,000
30,000,000 20,000,000 6,000,000 10,000,000 10,000,000 50,940,712 40,429,136 404,291,364
2 ELECTRICAL 3 Isolasi Hitam 4 Kabel Tembaga @1M Colokan Double Colokan Kabel Listrik Colokan Rumah Listrik Bohlan 24W
Air
454,545,455 65,909,090.91
45,454,545.45
447,954,545 64,953,409.09
Merk
HARGA SATUAN
SUMBER I
SUMBER II
30,000 Bengkel Fajar Angaya SP II
550,000 900,000
Penguin wah tandon)
Wavin Maspion Maspion
1,900,000 5,000 10,000 20,000 4,000 30,000 30,000 4,000 6,000
Toko Serba guna Yos Sudarso (Gunawan)
195,000 950,000 175,000 95,000
Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan)
Toko UD Kartika Jaya SP II Toko UD Kartika Jaya SP II Toko UD Kartika Jaya SP II Toko Aditama Toko Aditama Toko Aditama
5,000 Toko SP II 10,000 Toko SP II Philips
45,000 Toko SP II
HARGA PERKIRAAN SENDIRI (HPS) O KEGIATAN PENGEBORAN TAHUN 2015
NO A.1 1 2 3 4 5 6 A.2 1 2 3 4 5 6 7 8 9 11 A.3 1 2 3
A A.4
1 2 3 A.5 1 2 3 4 5 A.5 1 2 3 A.6 1 2 3 4 5 6
B
B.1 B.2 B.3 B.4 B.5
PERKIRA AN KUANTIT JENIS ITEM AS SATUAN Pekerjaan Lapangan Mobilisasi, Demobilisasi; Transportasi OH 8 Upah Buruh harian @5 orang Trip 10 Sewa Truck Liter 35 Solar Hari 30 Sewa Kendaraan Roda 4 @1 Buah Hari 30 Sewa Kendaraan Roda 2 @1 Buah Liter 100 Bensin Pekerjaan Pengeboran Meter 45 Peralatan bor 1 lubang @45Meter; 2" LS 1 Setup dan de-setup rig Hari 30 Upah Buruh harian @5 orang Hari 30 Upah Juru bor Harian @1 orang Hari 30 Upah Supervisor lapangan @1 orang Galon 5 Polimer Kaleng 2 Grease Liter 100 Solar Buah 8 Pipa Galvanis 2" @6 Meter
HARGA SATUAN
200,000 750,000 6,900 750,000 200,000 7,300 400,000 3,000,000 200,000 500,000 550,000 1,450,000 250,000 6,900 550,000
Gravel Pekerjaan Pembersihan Sumur LS 1 Pembersihan Sumur Bor Hari 2 Upah Buruh harian @5 orang Hari 2 Upah Supervisor lapangan @1 orang Pekerjaan Konstruksi Sumur Upah Buruh harian @5 orang Hari 2 Sak 10 Semen Rate 0.5 Pasir Pekerjaan Pemasangan Pipa Upah Buruh harian @5 orang Hari 3 Pipa Paralon AW 3/4" @4M Meter 40 Buah Elbow 3/4" 20 Buah 4 Water Mur 3/4" Buah 5 Keran Air Pekerjaan Rehab Menara Air @1100Lx8 Upah Buruh harian @5 orang Hari 10 Pekerjaan Rehab Menara Air Buah 1 Replace Tangki @1100Lx8 Buah 8 Pekerjaan Kelistrikan Upah Buruh harian @5 orang Hari 5 Isolasi Hitam Buah 3 Kabel Tembaga @1M Meter 40 Colokan Double Buah 1 Colokan Kabel Listrik Buah 2 Pipa Paralon 1/2" AW @4 Meter Meter 40 Pekerjaan Pembuatan Laporan Laporan Pendahuluan Buku 10 Laporan Akhir Buku 10 Biaya Komunikasi Kantor Utama Proyek Bulan 1 Biaya Komunikasi Lapangan Bulan 2 Biaya ATK Bulan 1
2,000,000 200,000 550,000 200,000 85,000 700,000 200,000 45,000 10,000 20,000 50,000 200,000 10,000,000 2,000,000 200,000 3,000 5,000 100,000 10,000 30,000 180,000 180,000 5,700,000 2,300,000 5,900,000
B
B.6
C
D
E F
Biaya Tenaga Ahli
Bulan 2 Pekerjaan Pembangunan Filter Air C.1 Biaya Buruh Harian @5 Orang Hari 5 C.2 Filter Mangan Buah 8 C.3 Filter Silika Buah 8 C.4 Filter Ferrolite Buah 8 C.5 Filter Karbon dan UV Buah 8 C.6 Biaya Uji Kualitas Air Bersih Sampel 10 C.7 Biaya Pembuatan Rangka Filter Air Buah 1 C.8 Pompa Air dari Sumur ke Filter Buah 1 C.9 Pompa Air dari Filter ke Tangki @1100L x 8 Buah 1 Biaya Penentuan Titik Sumur Bor D.1 Biaya Sewa Alat Survey LS 1 D.2 Biaya Ahli Hidrologi @1orang Hari 1 D.3 Upah Buruh Harian @3orang Hari 10 D.4 Biaya Pembuatan Gambar LS 1 D.5 Biaya Survey Lokasi Hari 10 PPN 10%
Keuntungan ~
20,000,000 200,000 2,000,000 2,000,000 1,000,000 1,000,000 3,000,000 20,000,000 9,000,000 450,000 30,000,000 20,000,000 200,000 10,000,000 1,000,000
RAAN SENDIRI (HPS) OWNER ESTIMATE (OE) GIATAN PENGEBORAN AIR TANAH TAHUN 2015 ITEM
Merk
HARGA SATUAN
SUB TOTAL A.1 8,000,000 7,500,000 241,500 22,500,000 6,000,000 730,000 18,000,000 3,000,000 30,000,000 15,000,000 16,500,000 7,250,000 500,000 690,000 4,400,000
B.2
2,000,000 2,000,000 1,100,000 2,000,000 850,000 350,000 3,000,000 1,800,000 200,000 80,000 250,000 10,000,000 10,000,000 16,000,000 5,000,000 9,000 200,000 100,000 20,000 1,200,000 1,800,000 1,800,000 5,700,000 4,600,000 5,900,000
120
ACCESSORIES BOR 1 Bearing bor 2 3 4 5 6 7 8 PLUMBING 1; GALVANIS 1 Pipa Galvanis 2" 2 Pipa Galvanis 3"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PLUMBING 2; PARALON Tandon 1100 L Dop 3/4" (katup bawah tandon) Lbo 3/4" Water Mur 3/4" Klem selang Isolasi Putih Pipa Paralon 3/4" AW @3 Meter Reducer 1" - 3/4" Reducer 1 1/2" - 1"
PEMBESIAN Besi Siku 5x5 Besi Plat 6x1m @1 Lembar Jaring Kawat Fernes Besi batangan 2x4
1 2 ELECTRICAL 3 Isolasi Hitam
30,000
550,000 900,000
Penguin
Wavin Maspion Maspion
### 5,000 10,000 20,000 4,000 30,000 30,000 4,000 6,000
195,000 950,000 175,000 95,000
40,000,000
4 Kabel Tembaga @1M Colokan Double Colokan Kabel Listrik Colokan Rumah Listrik Bohlan 24W
5,000,000 16,000,000 16,000,000 8,000,000 8,000,000 30,000,000 20,000,000 9,000,000 450,000 30,000,000 20,000,000 6,000,000 10,000,000 10,000,000 50,940,712 40,429,136 404,291,364
454,545,455 65,909,090.91
45,454,545.45
447,954,545 64,953,409.09
5,000 10,000 Philips
45,000
SUMBER I SUMBER II
Bengkel Fajar Angaya SP II
Toko Serba guna Yos Sudarso (Gunawan)
Toko UD Kartika Jaya SP II Toko UD Kartika Jaya SP II Toko UD Kartika Jaya SP II Toko Aditama Toko Aditama Toko Aditama
Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan) Toko Serba guna Yos Sudarso (Gunawan)
Toko SP II Toko SP II Toko SP II
500000000
Page 21
500000000
Page 22
500000000
Page 23
500000000
404291364
Page 24
DAFTAR ANALISA HARGA SATUAN UPAH : DALAM WILAYAH KABUPATEN ACEH BARAT (Kec. Kaway XVI, Kec. Pante Ceureumen, Kec. Sungai Mas, Panton Reu) : CIPTA KARYA : 2009
LOKASI BIDANG TAHUN
1. Anl. A.1
1 M3 Galian Tanah
0.750 0.025
Pekerja Mandor
2. Anl. A.18b 1.200 m3 0.300 0.010
3.
4.
5.
6.
7.
Anl. A.18d 1.200 m3 0.300 0.010
Anl. G.32h 1.200 m3 4.071 zak 0.522 m3 1.200 3.600 0.120 0.180
Anl. G.33h 720.000 bh 3.166 zak 0.406 m3 1.500 0.150 4.500 0.225
Anl. G.41 0.820 6.800 0.540 1.000 6.000 0.100 0.300
Anl. G.43 1.000 5.000 0.500 0.500 0.050 6.000 0.300
m3 zak m3
m3 zak m3
@Rp 36,000.00 @Rp 47,000.00 Jumlah …………..
1 m3 Timbunan Pasir Urug Pasir Urug @Rp 68,400.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m3 Batu Kosong Batu Kali Pekerja Mandor
@Rp 176,000.00 @Rp 36,000.00 @Rp 47,000.00 Jumlah …………..
1 m3 Beton Pondasi ( 1 : 4 ) Batu Kali @Rp 176,000.00 Semen @Rp 47,000.00 Pasir Pasang @Rp 79,800.00 Tukang @Rp 54,000.00 Pekerja @Rp 36,000.00 Kepala Tukang @Rp 59,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m3 Batu Merah Tebal 1/2 Batas 1 : 4 ps Batu Merah @Rp 570.00 Semen PC @Rp 47,000.00 Pasir Pasang @Rp 79,800.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m3 Beton Cor 1 : 2 : 3 (Setara K-175) Kerikil @Rp 74,100.00 Semen @Rp 47,000.00 Pasir Pasang @Rp 79,800.00 Tukang @Rp 54,000.00 Pekerja @Rp 36,000.00 Kepala Tukang @Rp 59,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m3 Beton Cor 1 : 3 : 5 Kerikil Semen PC Pasir Pasang Tukang Kepala Tukang Pekerja Mandor
@Rp 74,100.00 @Rp 47,000.00 @Rp 79,800.00 @Rp 54,000.00 @Rp 59,000.00 @Rp 36,000.00 @Rp 47,000.00 Jumlah …………..
Rp Rp Rp
Rp
-
27,000.00 1,175.00 28,175.00
28,175.00
Rp Rp Rp
10,800.00 470.00 11,270.00
93,350.00
Rp Rp Rp
10,800.00 470.00 11,270.00
222,470.00
Rp Rp Rp Rp Rp
64,800.00 129,600.00 7,080.00 8,460.00 209,940.00
654,132.60
Rp Rp Rp Rp Rp
81,000.00 8,850.00 162,000.00 10,575.00 262,425.00
854,025.80
Rp Rp Rp Rp Rp
54,000.00 216,000.00 5,900.00 14,100.00 290,000.00
713,454.00
Rp Rp Rp Rp Rp
27,000.00 2,950.00 216,000.00 14,100.00 260,050.00
609,050.00
82,080.00
Rp
82,080.00
Rp
211,200.00
Rp
211,200.00
Rp Rp Rp
211,200.00 191,337.00 41,655.60
Rp
444,192.60
Rp Rp Rp
410,400.00 148,802.00 32,398.80
Rp
591,600.80
Rp Rp Rp
60,762.00 319,600.00 43,092.00
Rp
423,454.00
Rp Rp Rp
74,100.00 235,000.00 39,900.00
Rp
Rp Rp Rp
349,000.00
8.
9.
Anl. G.50k 0.089 zak 0.019 m3 0.100 0.010 0.300 0.015
Anl. G.50h 0.178 zak 0.011 m3 0.150 0.015 0.400 0.020
10. Anl. G.53a 25.000 kg 1.000 0.100 6.000
11.
Anl. G.67 0.070 0.364 0.044 0.135 0.014 0.720 0.036
m3 zak m3
12. Anl. I.2 9.000 3.000 9.000 Bahan-bahan 110.000 kg 2.000 kg
13. Anl. F.8 0.220 4.100 5.000 0.500 2.000 0.100 2.000
14. Anl. F. 9 4.000 0.500
m3 kg
1 m2 Plesteran 1 : 4 T. 15 cm Semen PC @Rp 47,000.00 Pasir Pasang @Rp 79,800.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m2 Plesteran Trasram 1 : 2 T. 10 cm Semen PC @Rp 47,000.00 Pasir Pasang @Rp 79,800.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 100 m2 Cat Tembok Polymik/Setara Cat Tembok @Rp 21,400.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Jumlah ………….. Untuk 1 M2 …….. 1 m2 Lantai Beton Cor 1 : 3 : 5 T. 7 cm Kerikil Kasar @Rp 68,900.00 Semen PC @Rp 47,000.00 Pasir Pasang @Rp 79,800.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 100 kg Besi Beton Tukang Besi Kepala Tukang Pekerja Besi beton Kawat Beton
@Rp @Rp @Rp
Rp Rp
4,183.00 1,516.20
Rp
5,699.20
Rp Rp
8,366.00 877.80
Rp
9,243.80
Rp
535,000.00
Rp Rp
535,000.00 5,350.00
Rp Rp Rp
4,823.00 17,108.00 3,511.20
Rp
25,442.20
54,000.00 59,000.00 36,000.00
@Rp 10,500.00 @Rp 11,400.00 Jumlah ………….. Upah diambil 3/4 untuk 1 kg Besi
10 m2 Cetakan Beton/Bekisting Papan Cetakan @Rp 1,948,000.00 Paku @Rp 12,400.00 Tukang Besi @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Pek. (Bongkaran + Siram) @Rp 16,750.00 Jumlah ………….. Untuk 1 M2 …….. Membongkar/Menyiram Cetakan Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. Untuk 1 M2 ....….
Rp Rp Rp Rp
1,155,000.00 22,800.00 1,177,800.00 11,778.00
Rp Rp
428,560.00 50,840.00
Rp Rp
479,400.00 47,940.00
Rp Rp Rp Rp Rp
5,400.00 590.00 10,800.00 705.00 17,495.00
23,194.20
Rp Rp Rp Rp Rp
8,100.00 885.00 14,400.00 940.00 24,325.00
33,568.80
Rp Rp Rp Rp Rp
54,000.00 5,900.00 216,000.00 275,900.00 2,759.00
8,109.00
Rp Rp Rp Rp Rp
7,290.00 826.00 25,920.00 1,692.00 35,728.00
61,170.20
Rp Rp Rp
486,000.00 177,000.00 324,000.00
Rp Rp
987,000.00 7,402.50
19,180.50
Rp Rp Rp Rp Rp Rp Rp
270,000.00 29,500.00 72,000.00 4,700.00 33,500.00 409,700.00 40,970.00
88,910.00
Rp Rp Rp Rp
144,000.00 23,500.00 167,500.00 16,750.00
16,750.00
15. Anl. Supl. IIIa 1.000 m2 0.016 zak 0.025 m3 0.250 0.025 0.500 0.025
15. Anl. Supl. IIIc 1.000 m2 0.020 zak 0.030 m3 0.250 0.025 0.500 0.025
16. Anl. Supl. IVa 1.000 m2 0.020 zak 0.030 m3 0.250 0.020 0.500 0.025
17. Anl. G. 16 11.250 zak 1.080 m3
1 m2 Lantai Keramik 30 x 30 cm Keramik 30 x 30 cm @Rp 57,000.00 Semen Putih @Rp 146,000.00 Perekat (G.16) @Rp 614,934.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m2 Lantai Keramik Kulit Jeruk 20 x 20 cm Keramik 20 x 20 cm @Rp 61,800.00 Semen Putih @Rp 146,000.00 Perekat (G.16) @Rp 614,934.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m2 Dinding Keramik 20 x 25 cm Keramik 20 x 25 cm @Rp 61,800.00 Semen Putih @Rp 146,000.00 Perekat (G.16) @Rp 614,934.00 Tukang @Rp 54,000.00 Kepala Tukang @Rp 59,000.00 Pekerja @Rp 36,000.00 Mandor @Rp 47,000.00 Jumlah ………….. 1 m3 Perekat 1 : 2 Semen Pasir Pasang
@Rp 47,000.00 @Rp 79,800.00 Jumlah …………..
Rp Rp Rp
57,000.00 2,336.00 15,373.35
Rp
74,709.35
Rp Rp Rp
61,800.00 2,920.00 18,448.02
Rp
83,168.02
Rp Rp Rp
61,800.00 2,920.00 18,448.02
Rp
83,168.02
Rp Rp Rp
528,750.00 86,184.00 614,934.00
Beton Bertulang Sloof Ukuran 15/15 cm 1 : 2 : 3 (Besi 100 kg) Untuk Kolom Praktis, Sloof 100/M3 Beton Cor 1 : 2 : 3 (Anl. G.41) Rp 713,454.00 Untuk Pekerjaan & Bahan Besi (Anl. 1.2) 100 kg x Rp 19,180.50 Cetakan Beton (Anl. F.8) Rp 88,910.00 Jumlah …………..
Rp Rp Rp Rp Rp
13,500.00 1,475.00 18,000.00 1,175.00 34,150.00
108,859.35
Rp Rp Rp Rp Rp
13,500.00 1,475.00 18,000.00 1,175.00 34,150.00
117,318.02
Rp Rp Rp Rp Rp
13,500.00 1,180.00 18,000.00 1,175.00 33,855.00
117,023.02
614,934.00
18. Anl. Supl. V
Beton Bertulang Sloof Ukuran 15/15 cm 1 : 2 : 3 (Besi 110 kg) Untuk Kolom Praktis, Balok, Lantai, Ring Balok 100/M3 Beton Cor 1 : 2 : 3 (Anl. G.41) Rp Untuk Pekerjaan & Bahan Besi (Anl. 1.2) 110 kg x Rp Cetakan Beton (Anl. F.8) Rp Jumlah …………..
Rp Rp Rp Rp
713,454.00 1,918,050.00 88,910.00 2,720,414.00
2,720,414.00
Rp Rp Rp Rp
713,454.00 2,109,855.00 88,910.00 2,912,219.00
2,912,219.00
19. Anl. Supl. Va
713,454.00 19,180.50 88,910.00
Meulaboh, 14 April 2009 Penawar, CV. RAHMAD
RAHMAD IRMAYUDI, SE Direktur
DAFTAR HARGA UPAH DAN BAHAN LOKASI BIDANG TAHUN NO. 1
: DALAM WILAYAH KABUPATEN ACEH BARAT (Kec. Kaway XVI, Kec. Pante Ceureumen, Kec. Sungai Mas, Panton Reu) : CIPTA KARYA : 2009 U RAIAN 2
Sudah termasuk PPN KETERANGAN 4
J U M LA H 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A. U P A H Mandor Lapangan Mekanik Mekanik Pembantu Kepala Tukang Tukang Operator Terlatih Operator Kurang Terlatih Pembantu Operator Supir Truk Supir Personil Pembantu Supir Buruh Lapangan Tak Terlatih / Pekerja Buruh Lapangan Kurang Terlatih Buruh Lapangan Terlatih Upah Penggergaji
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
47,000.00 72,000.00 45,000.00 59,000.00 54,000.00 81,000.00 45,000.00 41,000.00 45,000.00 45,000.00 36,000.00 36,000.00 37,000.00 41,000.00 3,200.00
/Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /Hari /M2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
B. HARGA BAHAN B. 1. BAHAN LOKAL Timbunan Pilihan Tanah Timbun Kerikil Kasar Kerikil Halus Kerikil Campur Tanah Kerikil Saring 2/3 Kerikil Saring 1/2 Pasir Pasang Pasir Urug Batu Pecah 10-15 cm Batu Pecah 7-10 cm Batu Pecah 5-7 cm Batu Pecah 3-5 cm Batu Pecah 2-3 cm Batu Pecah 1-2 cm Batu Pecah 0,5-1 cm Sirtu Pasir Beton Agregat Base Klas A Agregat Base Klas B Agregat Base Klas C Portland Cement (40 kg) Portland Cement (40 kg) Semen Putih Batu Bata Batu Kali/Belah/Gunung Besi Beton Polos Kawat Ikat Beton Kawat Bronjong 4 mm Paku Biasa Paku Asbes + Karet Paku Skrup Paku Seng Paku Reng Atap Seng Cat Pabrik Atap Seng Bjls 0,20 mm Atap Seng Bjls 0,3 mm Seng Perabung Seng Plat Genteng Metal Bubungan Genteng Metal Flashing Metal
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
79,800.00 68,400.00 68,900.00 74,100.00 74,100.00 80,800.00 85,500.00 79,800.00 68,400.00 214,000.00 214,000.00 214,000.00 228,000.00 228,000.00 285,000.00 285,000.00 74,100.00 79,800.00 285,000.00 271,000.00 238,000.00 47,000.00 200,000.00 146,000.00 570.00 176,000.00 10,500.00 11,400.00 16,200.00 12,400.00 16,200.00 140.00 15,700.00 12,400.00 12,100.00 9,700.00 10,700.00 35,600.00 61,800.00 78,900.00 61,800.00 26,100.00
/M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /Zak /Tong /Zak /Bh /M3 /Kg /Kg /Kg /Kg /Kg /Bh /Kg /Kg /Kk /Kk /Kk /Lbr /Lbr /M2 /M2 /M2
1 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
2 Genteng Beton Perabung Genteng Beton Kayu Seumantok/Setara Kayu Seumantok Kuda-kuda/Setara Kayu Tarahan/Rangka Plafond Kayu Bakar Kayu Meurante Kayu Kamper/Krueng Kayu Medang Papan Meurante Kayu Perancah Papan Reider Kayu Stut/Dolken Kayu Bekesting/Papan Cetak Triplek 4 mm Teakwood 6 mm Gypsum 9 mm Plafond Asbes Quality Asbes Gelombang Kecil Rabung Asbes Lat Plafond Lat Profil Cat Tembok Polymik/Setara Cat Menie Cat Dasar Cat Warna Dempul Kayu Plamir Tembok Cat Minyak Amplas Sirlak Spirtus Minyak Kilat Residu Keramik 20 x 20 cm Keramik 30 x 30 cm Keramik 20 x 25 cm Keramik Jeruk 30 x 30 cm Keramik 40 x 40 cm Kaca Bening 5 mm Tegel PC Kepala Basah 20 x 20 cm Plat Tegel PC Kep. Basah 15 x 30 cm Aspal Bitumen Pelumas Bensin Minyak Solar Buis Beton dia. 80 cm Buis Beton dia. 60 cm Buis Beton dia. 40 cm Batu Kerawang Paving Block
3 Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
4,800.00 6,200.00 2,850,000.00 2,850,000.00 1,948,000.00 428,000.00 2,375,000.00 2,375,000.00 2,375,000.00 47,500.00 1,948,000.00 57,000.00 1,615,000.00 1,948,000.00 20,400.00 26,100.00 166,300.00 9,000.00 25,200.00 14,300.00 2,400.00 7,100.00 21,400.00 14,300.00 11,400.00 26,400.00 11,400.00 11,900.00 26,400.00 2,400.00 8,600.00 8,100.00 12,400.00 6,200.00 61,800.00 57,000.00 61,800.00 66,500.00 66,500.00 118,800.00 2,900.00 2,600.00 8,600.00 30,900.00 6,200.00 5,900.00 161,500.00 142,500.00 123,500.00 7,100.00 4,800.00
4 /Bh /Bh /M3 /M3 /M3 /M3 /M3 /M3 /M3 /Lbr /M3 /Lbr /M3 /M3 /M2 /M2 /Lbr /M2 /Lbr /M' /M' /M' /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Lbr /Kg /Ltr /Ltr /Ltr /M2 /M2 /M2 /M2 /M2 /M2 /Bh /Bh /Kg /Ltr /Ltr /Ltr /Bh /Bh /Bh /Bh /Bh
Penawar,
Direktur
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULLE) PROGRAM
: PENYEDIAAN DAN PENGOLAHAN AIR BAKU
KEGIATAN
: PEMBANGUNAN SUMUR-SUMUR AIR TANAH
PEKERJAAN
: PEMBANGUNAN SUMUR BOR & MCK DESA PASIE JEUMPA
KECAMATAN
: KAWAY XVI
TAHUN
: 2009 JUMLAH
NO.
URAIAN PEKERJAAN
HARGA
JANGKA WAKTU PELAKSANAAN BOBOT
(Rp.)
BULAN KE-I I
II
III
BULAN KE-II IV
I
II
III
BULAN KE-III IV
I
II
III
BULAN KE-IV IV
I
II
III
BULAN KE-V IV
I
II
KET.
III
IV 100 %
A.
PEKERJAAN PERSIAPAN
5,322,000.00
4.662
B.
PEKERJAAN SUMUR BOR
22,468,000.00
19.683
C.
PEKERJAAN MEMBANGUN BARU MCK I. PEKERJAAN TANAH II. PEKERJAAN PASANGAN DAN BETON III. PEKERJAAN SANITASI DAN ELEKTRIKAL
D.
0.52
0.52
0.52
2.19
2.19
0.52 2.19
2.19
2.19
2.19
2.19
2.19
0.52
0.52
0.52
0.52
0.52
90 % 80 %
2.19
70 %
697,652.25
0.611
59,187,672.63
51.850
3,414,500.00
2.991
0.20
0.20
0.20
3.70
3.70
60 %
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
0.43
0.43
0.43
0.43
0.43
0.43
0.43
40 %
PEKERJAAN HIDRANT UMUM 1 (SATU) UNIT I. PEKERJAAN TANAH
50 %
753,630.75
0.660
II. PEKERJAAN BETON DAN PASANGAN
5,286,022.82
4.631
III. PEKERJAAN PENGADAAN DAN
6,463,000.00
5.662
10,558,612.60
9.250
Jumlah Total
114,151,091.05
100.000
Dibulatkan
114,150,000.00
0.17
0.17
0.17
0.17
0.58
0.58
30 %
0.58
0.58
0.58
0.58
0.58
0.58
0.94
0.94
0.94
0.94
0.94
0.94
0.92
0.92
0.92
0.92
0.92
0.92
20 %
PEMASANGAN WATER TANK DAN RIS IV. PEKERJAAN LAIN-LAIN
0.92
0.92
0.92
10 %
0.92
0%
RENCANA
Minggu
0.52
2.70
2.70
2.39
6.26
6.26
6.63
6.63
7.39
7.91
6.67
6.67
6.15
6.58
6.00
6.00
5.57
5.57
0.95
0.43
Kumulatif
0.52
3.22
5.93
8.32
14.58
20.84
27.47
34.11
41.50
49.41
56.08
62.75
68.90
75.48
81.48
87.48
93.05
98.63
99.57
100.00
Meulaboh, 14 April 2009 Penawar, CV. RAHMAD
RAHMAD IRMAYUDI, SE Direktur