GAMBAR KERJA Usulan Kegiatan Desa Kecamatan
: : :
PEMBANGUNAN WC UMUM batunilamung KAJANG
gambar tampak depan km/ wc
gambar tampak belakang km/ wc
gambar denah km/ wc
gambar potongan g
300
300
GA M BAR RE NCA NA
150
150
K ABU PA TEN B ULU KU MBA
KEC AM ATA N KAJ AN G
D ESA BAT UNI LAM UNG
150
150
JE NI SPR ASARA NA M CK UM UM
+ 0,40
LO K AS I K EG IA TAN DU SU NP ARUKK U
JU DUL GA MB AR Den ah & TA MP AK SA MPI NG
D ena h
D ig am ba r/Dire nc anak an Oleh:
K A LA 1 CM : 1 00 CM S
150
Tim Pengel ola K eg ia ta n
T enaga P ere nca na
SAE NAL AB IDIN , S .Pd
R ADE N AYU KUSTRIA
D IPE RIKSAO LE H: Te nag a A hli Infra stru k tur Des a
Ir. BUS TAM
50
g 150
30
+ 0,40
100
225
+ 0,45
+0,40
D ise tu ju i Oleh K epa la D esa Batu nil amu ng
TAMPAK SAMPI NG K ALA 1 CM : 1 00 CM S
A BD . RA UF LE MB AR
150
±0,00 G AM BA RRE NCANA KAB UPA TE N BUL UKU MB A
K ECA MA TAN K AJAN G
DE SA PO SSI TAN AH
J ENI SPR AS ARA NA MC K U MUM
LO KA SI KE GIAT AN B ON TO M AR AH E
J UD UL GAM BA R TA MP AK Di gam bar /Direnca nak an O leh :
45
SA ENA L A BIDIN, S.P d R AD EN AYU KUST RIA
T im P en gelo la K egiatan Tenaga Pe re nc ana
SAEN AL A BID IN, S.Pd RA DEN A YU K USTRI A DIPER IKSA O LEH : T enaga Ahli Infr astruk tur De sa
TAMPAK DEPAN SK ALA 1 CM : 20 C M
Ir . BUS TAM Dise tuj ui Ol eh K epala D es a Pos si T anah
K ASM AT AL I L EM BAR
POTONGAN SKALA 1 CM : 100 CM
45 150
TAMPAK DEPAN SKALA 1 CM : 100 CM
gambar tampak samping kanan
100
Program pembangunan Dan Pemberdayaan Masyarakat Desa REKAPITULASI RENCANA ANGGARAN BIAYA (R-RAB) Jenis Prasarana : Pembangunan MCK umum Propin : Sulawesi Selatan Kabupa : Bulukumba
Kecamatan Desa
Jenis Kegiatan Ukuran/Dimensi Uraian Lokasi No. RAB
: KAJANG : POSSI TANAH
: Pembangunan MCK : Sorga Desa : : Bobot JUMLAH TOTAL : Dusun : % No : : Dana Desa Swadaya Dana Desa I Bahan Rp 23,288,696.28 68.554% Rp 23,288,696.28 II Alat Rp 42,500.00 0.125% Rp 42,500.00 III Upah Rp 10,640,000.00 31.321% Rp 10,640,000.00 JUMLAH Rp 33,971,196.28 100% Rp 33,971,196.28 IV Operasional TPK 5 % Rp 1,698,559.81 - Pembekalan Tim Desain 0.5 % 0.500 Rp 169,855.98 - Survey Teknis dan Pengukuran 0.5% 0.500 Rp 169,855.98 - Pembuatan Desain dan RAB 1.5% 1.500 Rp 509,567.94 - Transpor TPK 1% 1.000 Rp 339,711.96 - Dokumentasi dan Pelaporan TPK 0.5 % 0.500 Rp 169,855.98 - Pengawasan 1 % 1.000 Rp 339,711.96 Jumlah Biaya Upah Rp 10,640,000.00 Jumlah HOK Konstruksi HOK Jumlah Total Dana Desa (I+II+III+IV) Rp 35,669,756.10 Possi Tanah Diketahui Kepala Desa Possi Tanah
Bobot %
68.554% 0.125% 31.321% 100%
27 Februari 2018 Dibuat oleh TPK Desa possi tanah
31.32% PKT
KASMAT ALI
SAINAL ABIDIN, S.Pd
Rp 10,640,000.00 Rp 33,971,196.28
Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan NO. RAB I I.1 I.2 I.3 I.4 I.5 I.6 I.7 I.8 I.9 II II.1 II.2 II.3 II.4 II.5 II.6 II.7 II.8 II.9 II.10 II.11 II.12 III III.1 III.2 III.3 III.4 III.5
: : : : :
SULAWESI SELATAN BULUKUMBA KAJANG batunilamung PEMB. TOILET umum
URAIAN PEKERJAAN PEKERJAAN BATU & BETON - Pek. Galian Tanah Pondasi Garis & Bt. Bata - Pek. Pasangan Pondasi Batu Gunung - Pekerjaan Sloef Beton 15/20 - Pek. Pas. Dinding Bata Trassaram - Pekerjaan Urugan Tanah - Pek. Plesteran Dinding Trassaram - Pek. Acian Semen Dilicin - Pek. Pas. Dinding Keramik 20x25 - Pek. Pas. Lantai Keramik 20x20 JUMLAH I PEK. ATAP & SANITAIR $0.00 - Pas. Atap Seng - Pek. Bubungan Atap Seng - Pas. Listplank Calcyboard - Pek. Pipa Air Bersih Ø 3/4" - Pek. Pipa Air Kotor Ø 4" - Pek. Pas. Kran Air - Pek. Pas. Floor Drain - Pek. Pas. Septick Tank - Pek. Pas. Kloset Jongkok $0.00 - beton bertulang JUMLAH II
REKAPITULASI RENCANA ANGGARAN BIAYA
BAHAN
PERALATAN
UPAH
BOBOT (%)
851,000.00 1,914,500.00 2,908,700.00 143,000.00 997,400.00 362,500.00 1,463,600.00 696,200.00 9,336,900.00
-
475,000.00 285,900.00 523,600.00 1,452,600.00 100,000.00 2,630,800.00 954,000.00 732,700.00 435,900.00 7,590,500.00
2.01 4.82 10.33 18.48 1.03 15.38 5.58 9.31 4.80
250,000.00 500,000.00 181,000.00 54,000.00 823,300.00 324,000.00 2,132,300.00
-
275,000.00 275,000.00 475,000.00 275,000.00 550,000.00 285,900.00 2,135,900.00
2.23 3.28 2.78 1.39 5.82 2.58
275,000.00 275,000.00 475,000.00 1,025,000.00
2.54 1.31 1.45 4.88
30,000.00 10,751,400.00 23,595,020.00
100.00
PEK. PINTU, PENGGANTUNG & PENGECATAN
- Pek. Pas. Pintu Aluminium - Pek. Pas. Grendel Pintu - Pek. Pas. Engsel Pintu - Pek. Cat Atap Seng pek. Beton bertulang JUMLAH III
SUB JUMLAH UMLAH BAHAN, PERALATAN DAN UPAH
600,000.00 33,000.00 66,000.00 645,420.00 1,344,420.00
12,813,620.00
30,000.00 30,000.00
SURVEY & DESAIN PENGAWASAN
708,000.00 472,000.00
JUMLAH TOTAL
24,775,020.00
DIBULATKAN
24,775,000.00
Disetujui Oleh
Pannyangkalang, ……………..2016 Dibuat Oleh,
Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan NO. RAB
: : : : :
SULAWESI SELATAN BULUKUMBA KAJANG batunilamung PEMB. TOILET umum
URAIAN PEKERJAAN
REKAPITULASI RENCANA ANGGARAN BIAYA
BAHAN
PERALATAN
UPAH
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
BOBOT (%)
PROVINSI KABUPATEN KECAMATAN DESA KEGIATAN Volume
: : : : : :
SULAWESI SELATAN BULUKUMBA KAJANG BATUNILAMUNG Pembangunan MCK Umum 3 X 1.5
REKAP BAHAN, UPAH DAN ALAT
VOL.
SAT.
HARGA SATUAN
BAHAN Batu Gunung
2.00
M³
233,000.00
58.87
sak
72,500.00
Pasir
9.68
M³
255,000.00
Kayu terentang
0.78
M³
2,182,000.00
Paku biasa 2' -5'
11.94
Kg
18,000.00
5.97 72.56 14.00 6.99 3.52 3,089.00 13.00 24.00 8.00 8.00 2.00 6.00 4.00 4.00 8.00 1.00 2.00 2.00 2.00 2.00 2.00 6.00 6.00 6.00
Ltr btg btg Kg M3 Bh dos kg sak dos Kg lbr btg btg Bh Bh Bh Unit unit bh bh Kg Kg Kg
45,000.00 64,000.00 54,000.00 24,800.00 286,000.00 700.00 65,500.00 15,000.00 72,500.00 59,000.00 20,000.00 45,000.00 50,000.00 100,000.00 22,000.00 5,000.00 27,000.00 300,000.00 300,000.00 16,500.00 33,000.00 30,500.00 21,000.00 22,700.00
Semen Portland
Minyak bekisting besi 10 Besi 6 Kawat beton Kerikil Bata Merah Keramik 20/25 Semen Warna Semen pvc Tegel keramik 20/20 paku trifleks - Pek. Pipa Air Bersih Ø 3/4" - Pek. Pipa Air Kotor Ø 4" Kran Air Sealtape Floor Drain Closet Jongkok Kusen & Daun Pintu Aluminium Grendel Pintu Engsel Pintu Plamuur Cat Dasar Tembok Cat Penutup Tembok
JUMLAH
23,288,696.28
REKAP BAHAN, UPAH DAN ALAT
VOL.
SAT.
HARGA SATUAN
Lbr Bh Bh
3500.00 12500.00 15000.00
ALAT 1 Kertas Gosok 2 Kuas 2" 3 Kuas 4"
1.00 2.00
JUMLAH
42,500.00 UPAH
1 2 3 4 6 7
Pekerja Tukang Batu Tukang Kayu Tukang besi Tukang Cat Kepala Tukang
58.00 33.00 4.00 3.00 4.00 16.00
-
80,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
JUMLAH
10,640,000.00
TOTAL Disetujui Oleh Kepala Desa Batunilamung
ABD. RAUF
33,971,196.28 Tenaga Perencana Infrastruktur Teknik
Dibuat Oleh TPK Desa batunilamung
ASRAN
MUH. RAMLI
TOTAL 466,000.00 4,268,365.00 2,467,730.63 1,709,324.25 214,920.00 268,650.00 4,643,783.78 756,000.00 173,328.75 1,005,593.88 2,162,300.00 851,500.00 360,000.00 580,000.00 472,000.00 40,000.00 270,000.00 200,000.00 400,000.00 176,000.00 5,000.00 54,000.00 600,000.00 600,000.00 33,000.00 66,000.00 183,000.00 126,000.00 136,200.00
23,288,696.28
TOTAL 12,500.00 30,000.00
42,500.00 4,640,000.00 3,300,000.00 400,000.00 300,000.00 400,000.00 1,600,000.00
10,640,000.00 33,971,196.28 -
K Desa batunilamung
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. 1.1
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Kusen & Daun Pintu Aluminium
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.000
HARGA SATUAN (Rp.)
VOLUME
2.000
III.1 ADD - Pek. Pas. Pintu Aluminium GAMBAR RENCANA 2.00 unit
unit
TOTAL (Rp.)
300,000
600,000
1.2 1.3 II. 2.1. 2.2. III. 3.1 3.2 3.3
SUB TOTAL I
600,000
SUB TOTAL II
-
PERALATAN
U P A H
SUB TOTAL III
-
TOTAL
600,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. 1.1 1.2 1.3 1.4 II. 2.1. 2.2. III. 3.1 3.2 3.3
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Grendel Pintu
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.000
HARGA SATUAN (Rp.)
VOLUME
2.00
III.2 ADD - Pek. Pas. Grendel Pintu GAMBAR RENCANA 2.00 bh
bh
TOTAL (Rp.)
16,500
33,000
SUB TOTAL I
33,000
SUB TOTAL II
-
PERALATAN
U P A H Pekerja Tukang Kayu Kepala tukang
0.015 0.150 0.015
1.00 1.00 1.00
Oh Oh Oh
75,000 100,000 100,000 SUB TOTAL III
75,000 100,000 100,000 275,000
TOTAL
308,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. 1.1 1.2
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Engsel Pintu
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.000
HARGA SATUAN (Rp.)
VOLUME
2.00
III.3 ADD - Pek. Pas. Engsel Pintu GAMBAR RENCANA 2.00 bh
bh
TOTAL (Rp.)
33,000
66,000
1.3 II. 2.1. 2.2. III. 3.1 3.2 3.3
SUB TOTAL I
66,000
SUB TOTAL II
-
PERALATAN
U P A H Pekerja Tukang Kayu Kepala tukang
0.015 0.150 0.015
1.00 1.00 1.00
Oh Oh Oh
75,000 100,000 100,000 SUB TOTAL III
75,000 100,000 100,000 275,000
TOTAL
341,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
VOLUME
III.4 ADD - Pek. Cat Atap Seng GAMBAR RENCANA - m2 HARGA SATUAN (Rp.)
TOTAL (Rp.)
I. I.1 I.2 I.3
B A H A N Cat Meni Dempul Kayu Cat Besi
0.200 0.250 0.250
-
Kg Kg Kg
35,000 30,300 85,000 SUB TOTAL I
-
II. II.1. II.2. II.3.
PERALATAN Kertas Gosok Kuas 2"
0.2000 0.0750
-
Lbr Bh
3,500 12,500
-
SUB TOTAL II III. III.1 III.2 III.3
U P A H Pekerja Tukang Cat Kepala Tukang
0.100 0.210 0.010
-
Oh Oh Oh
-
75,000 100,000 100,000
-
SUB TOTAL III
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N
I. I.1. I.2. I.3.
B A H A N Plamuur Cat Dasar Tembok Cat Penutup Tembok
II. II.1. II.2. II.3.
PERALATAN Kuas 4"
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
III.5 ADD pek. Beton bertulang GAMBAR RENCANA 56.25 M2 HARGA SATUAN (Rp.)
VOLUME
TOTAL (Rp.)
0.100 0.100 0.260
6.00 6.00 15.00
Kg Kg Kg
30,500 20,320 22,700 SUB TOTAL I
183,000 121,920 340,500 645,420.00
0.0300
2.00
Bh
15,000
30,000
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Cat Kepala Tukang
0.0200 0.0630 0.0063
1.00 4.00 -
Oh Oh Oh
30,000.00
75,000 100,000 100,000 SUB TOTAL III
75,000 400,000 475,000
TOTAL
1,150,420
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
NO
U R A I A N
I. I.1. I.2.
B A H A N Rangka Besi Aluminium Hollow Assesoris
II. II.1. II.2. II.3. III. III.1. III.2. III.3.
No. RAB Program
: II.11 : ADD Jenis Kegiatan : Ukuran/Dimensi : GAMBAR RENCANA Volume : - M2
KOEF.
VOLUME
4.000 1.000
-
HARGA SATUAN (Rp.) M1 Ls
$0.00
TOTAL (Rp.)
7,500 7,500 SUB TOTAL I
-
SUB TOTAL II
-
PERALATAN
U P A H Pekerja Tukang Kepala Tukang
0.3500 0.3500 0.0530
-
Oh Oh Oh
75,000 110,900 100,000 SUB TOTAL III
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3. I.4.
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Gypsum Board Paku Skrup
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
0.364 0.110
HARGA SATUAN (Rp.)
VOLUME
4.00 1.00
II.12 ADD - beton bertulang GAMBAR RENCANA 12.00 M2
lembar kg
TOTAL (Rp.)
66,000 60,000
264,000 60,000
SUB TOTAL I II. II.1. II.2. II.3.
324,000.00
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3. III.4. III.5.
U P A H Pekerja Tukang Kepala Tukang
0.1000 0.0500 0.0100
1.00 1.00 1.00
Oh Oh Oh
-
75,000 110,900 100,000
75,000 110,900 100,000
SUB TOTAL III
285,900
TOTAL
609,900
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N
I. 1.1
B A H A N Balok Kayu Kelas II
1.2 1.3
Besi Strip tebal 5 mm Paku 12 cm
II. 2.1. 2.2.
PERALATAN
III. 3.1 3.2 3.3
U P A H Pekerja Tukang Kayu Kepala Tukang
No. RAB Program
: II.1 : ADD Jenis Kegiatan : Ukuran/Dimensi : GAMBAR RENCANA Volume : - M3 HARGA SATUAN (Rp.)
$0.00
KOEF.
VOLUME
1.100
-
M3
3,160,000
-
15.000 3.000
-
Kg Kg
12,000 17,000 SUB TOTAL I
-
SUB TOTAL II
-
75,000 100,000 100,000 SUB TOTAL III
-
6.700 20.100 2.010
-
Oh Oh Oh
TOTAL (Rp.)
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. 1.1 1.2 1.3
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Seng Gelombang 3" x 6" Paku Seng
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
VOLUME
0.700 0.020
-
II.2 ADD - Pas. Atap Seng GAMBAR RENCANA HARGA SATUAN (Rp.)
Lbr Kg
TOTAL (Rp.)
83,400 30,000
-
SUB TOTAL I II. 2.1. 2.2. III. 3.1 3.2 3.3
$0.00
-
PERALATAN
U P A H Pekerja Tukang Kepala Tukang
0.120 0.060 0.006
-
Oh Oh Oh
SUB TOTAL II
-
75,000 100,000 100,000 SUB TOTAL III
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. 1.1 1.2
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Seng Pelat 3" x 6" Bjls 35 Paku Seng
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
VOLUME
0.300 0.040
-
II.3 ADD - Pek. Bubungan Atap Seng GAMBAR RENCANA $0.00 HARGA SATUAN (Rp.)
Lbr Kg
TOTAL (Rp.)
61,000 30,000
-
1.3 II. 2.1. 2.2. III. 3.1 3.2 3.3
SUB TOTAL I
-
SUB TOTAL II
-
75,000 100,000 100,000 SUB TOTAL III
-
PERALATAN
U P A H Pekerja Tukang Kepala Tukang
0.150 0.070 0.007
-
Oh Oh Oh
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1 I.2 I.3 II. II.1. II.2. II.3. III. III.1 III.2 III.3
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Papan Calcyboard Paku biasa 2" - 5"
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
VOLUME
1.100 0.060
-
II.4 ADD - Pas. Listplank Calcyboard GAMBAR RENCANA $0.00 HARGA SATUAN (Rp.)
m kg
TOTAL (Rp.)
27,000 18,000
-
SUB TOTAL I
-
SUB TOTAL II
-
PERALATAN
U P A H Pekerja Tukang Kepala tukang
0.100 0.100 0.010
-
hari hari hari
75,000 100,000 100,000
-
SUB TOTAL III
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
NO
U R A I A N
I. I.1. I.2. I.3.
B A H A N Pipa PVC Ø 3/4 " Perlengkapan Pipa Air Bersih
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.200 0.350
HARGA SATUAN (Rp.)
VOLUME
4.00 1.00
II.5 ADD - Pek. Pipa Air Bersih Ø 3/4" GAMBAR RENCANA 3.00 M
btg ls
TOTAL (Rp.)
50,000 50,000
200,000 50,000
SUB TOTAL I II. II.1. II.2. II.3.
250,000.00
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala tukang
0.0360 0.0600 0.0060
1.00 1.00 1.00
OH OH OH
-
75,000 100,000 100,000 SUB TOTAL III
75,000 100,000 100,000 275,000
TOTAL
525,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3.
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Pipa PVC Ø 3 " Perlengkapan Pipa 3"
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.20 0.35
HARGA SATUAN (Rp.)
VOLUME
4.00 1.00
II.6 ADD - Pek. Pipa Air Kotor Ø 4" GAMBAR RENCANA 3.00 bt
btg ls
TOTAL (Rp.)
100,000 100,000
400,000.00 100,000
SUB TOTAL I II. II.1. II.2. II.3.
500,000.00
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala tukang
0.081 0.135 0.014
1.00 1.00 1.00
Oh Oh Oh
-
75,000 100,000 100,000 SUB TOTAL III
75,000.00 100,000.00 100,000.00 275,000
TOTAL
775,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3.
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Kran Air Sealtape
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.000 0.025
HARGA SATUAN (Rp.)
VOLUME
8.00 1.00
II.7 ADD - Pek. Pas. Kran Air GAMBAR RENCANA 8.00 bh
Bh Bh
TOTAL (Rp.)
22,000 5,000
176,000 5,000
SUB TOTAL I II. II.1. II.2. II.3.
181,000
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala tukang
0.010 0.400 0.040
1.00 3.00 1.00
Oh Oh Oh
-
75,000 100,000 100,000 SUB TOTAL III
75,000.00 300,000.00 100,000.00 475,000
TOTAL
656,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3.
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N B A H A N Floor Drain
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.000
HARGA SATUAN (Rp.)
VOLUME
2.00
II.8 ADD - Pek. Pas. Floor Drain GAMBAR RENCANA 2.00 bh
Bh
TOTAL (Rp.)
27,000
54,000
SUB TOTAL I II. II.1. II.2. II.3.
54,000
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala tukang
0.010 0.100 0.010
1.00 1.00 1.00
Oh Oh Oh
-
75,000 100,000 100,000 SUB TOTAL III
75,000.00 100,000.00 100,000.00 275,000
TOTAL
329,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3. I.4. I.5. II. II.1. II.2. II.3. III. III.1. III.2. III.3. III.4. III.5.
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N
No. RAB Program Jenis Kegiatan Ukuran/Dimensi Volume
KOEF.
: : : : :
II.9 ADD - Pek. Pas. Septick Tank GAMBAR RENCANA - unit HARGA SATUAN (Rp.)
VOLUME
B A H A N
TOTAL (Rp.)
SUB TOTAL I
-
SUB TOTAL II
-
PERALATAN
U P A H Pekerjaan Septick Tank
1.000
-
Ls
2,500,000
-
SUB TOTAL III
-
TOTAL
-
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA KAJANG batunilamung PEMB. TOILET KANTOR
U R A I A N
I. I.1. I.2. I.3.
B A H A N Closet Jongkok Semen Portland Pasir Pasang
II. II.1. II.2. II.3.
PERALATAN
No. RAB Program Jenis Kegiatan Ukuran/Dimensi Volume
KOEF.
1.000 0.120 0.010
II.10 ADD - Pek. Pas. Kloset Jongkok GAMBAR RENCANA 2.00 bh HARGA SATUAN (Rp.)
VOLUME
2.00 1.00 1.00
: : : : :
Unit Sak M3
TOTAL (Rp.)
300,000 72,000 151,300 SUB TOTAL I
600,000 72,000 151,300 823,300
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala tukang
1.000 1.500 0.150
2.00 3.00 1.00
Oh Oh Oh
-
75,000 100,000 100,000 SUB TOTAL III
150,000.00 300,000.00 100,000.00 550,000
TOTAL
1,373,300
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. 1.1 1.2 1.3 II. 2.1. 2.2. III. 3.1 3.2 3.3
: : : : :
SULAWESI SELATAN bulukumba kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
I.1 ADD - Pek. Galian Tanah Pondasi Garis & Bt. Bata
GAMBAR RENCANA 9.41 M3 HARGA SATUAN (Rp.)
VOLUME
B A H A N
TOTAL (Rp.)
SUB TOTAL I
-
SUB TOTAL II
-
PERALATAN
U P A H Pekerja Kepala Kelompok
0.550 0.010
5.00 1.00
OH OH
75,000 100,000
375,000 100,000
SUB TOTAL III
475,000
TOTAL
475,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N
No. RAB Program
: I.2 : ADD Jenis Kegiatan : - Pek. Pasangan Pondasi Batu Gunung Ukuran/Dimensi : GAMBAR RENCANA Volume : 2.00 M3
KOEF.
HARGA SATUAN (Rp.)
VOLUME
TOTAL (Rp.)
I. 1.1 1.2
B A H A N Batu Gunung Semen Portland
1.200 3.260
2.00 7.00
M³ sak
147,200 57,900
294,400 405,300
1.3
Pasir Pasangan
0.520
1.00
M³
151,300 SUB TOTAL I
151,300 851,000
II. 2.1. 2.2.
PERALATAN
SUB TOTAL II III. 3.1 3.2 3.3
U P A H Pekerja Tukang Batu Kepala Kelompok
0.300 0.600 0.022
1.00 1.00 1.00
OH OH OH
-
75,000 110,900 100,000 SUB TOTAL III
75,000 110,900 100,000 285,900
TOTAL
1,136,900
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N
I. I.1 I.2 I.3 I.4 I.5 I.6 I.7 I.8
B A H A N Kayu terentang Paku biasa 2' -5' Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir Beton Kerikil
II. II.1. II.2. II.3.
PERALATAN
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
0.220 3.200 1.600 150.000 2.250 6.720 0.540 0.810
HARGA SATUAN (Rp.)
VOLUME
0.10 2.00 1.00 71.00 1.00 3.00 1.00 1.00
I.3 ADD - Pekerjaan Sloef Beton 15/20 GAMBAR RENCANA 0.47 M3
M³ Kg Ltr Kg Kg Sak M3 M3
2,182,000 18,000 45,000 14,300 24,800 57,900 148,500 253,000 SUB TOTAL I
TOTAL (Rp.)
218,200.00 36,000.00 45,000.00 1,015,300.00 24,800.00 173,700.00 148,500.00 253,000.00 1,914,500.00
SUB TOTAL II III. III.1 III.2 III.3 III.4 III.5
U P A H Pekerja Tukang batu Tukang Kayu Tukang besi Kepala Tukang
0.300 1.050 1.050 3.050 0.010
1.00 1.00 1.00 1.00 1.00
OH OH OH OH OH
-
90,900 110,900 110,900 110,900 100,000 SUB TOTAL III
90,900 110,900 110,900 110,900 100,000 523,600
TOTAL
2,438,100
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N
I. I.1. I.2. I.3.
B A H A N Bata Merah Semen Portland Pasir Pasang
II. II.1. II.2. II.3.
PERALATAN
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
70.000 0.286 0.040
HARGA SATUAN (Rp.)
VOLUME
3,089.00 13.00 2.00
I.4 ADD - Pek. Pas. Dinding Bata Trassaram GAMBAR RENCANA 44.13 M2
Bh Sak M³
600 57,900 151,300 SUB TOTAL I
TOTAL (Rp.)
1,853,400 752,700 302,600 2,908,700.00
SUB TOTAL II III. U P A H III.1. Pekerja III.2. Tukang Batu III.3. Kepala Tukang
0.2200 0.1000 0.0100
10.00 4.00 1.00
OH OH OH
-
90,900 110,900 100,000 SUB TOTAL III
909,000 443,600 100,000 1,452,600
TOTAL
4,361,300
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3.
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N B A H A N Tanah Timbunan
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.20
HARGA SATUAN (Rp.)
VOLUME
1.00
I.5 ADD - Pekerjaan Urugan Tanah GAMBAR RENCANA 0.67 M3
M³
TOTAL (Rp.)
143,000
143,000.00
SUB TOTAL I II. II.1. II.2. II.3.
143,000.00
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Kepala Kelompok
0.100 0.010
1.00
OH OH
-
75,000 100,000
100,000.00
SUB TOTAL III
100,000
TOTAL
243,000
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3.
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N B A H A N Semen Portland Pasir Pasangan
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
0.156 0.023
HARGA SATUAN (Rp.)
VOLUME
12.00 2.00
I.6 ADD - Pek. Plesteran Dinding Trassaram GAMBAR RENCANA 79.28 M2
Sak M³
TOTAL (Rp.)
57,900 151,300
694,800 302,600
SUB TOTAL I II. II.1. II.2. II.3.
997,400
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala Kelompok
0.200 0.150 0.015
16.00 12.00 1.00
OH OH OH
-
75,000 110,900 100,000 SUB TOTAL III
1,200,000.00 1,330,800.00 100,000.00 2,630,800
TOTAL
3,628,200
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO I. I.1. I.2. I.3.
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N B A H A N Semen PC
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
0.065
HARGA SATUAN (Rp.)
VOLUME
5.00
I.7 ADD - Pek. Acian Semen Dilicin GAMBAR RENCANA 72.25 M2
sak
TOTAL (Rp.)
72,500
362,500
SUB TOTAL I II. II.1. II.2. II.3.
362,500
PERALATAN
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala Tukang
0.100 0.010 0.010
8.00 1.00 1.00
hari hari hari
-
90,900 110,900 115,900 SUB TOTAL III
727,200.00 110,900.00 115,900.00 954,000
TOTAL
1,316,500
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N
I. I.1. I.2. I.3. I.4.
B A H A N Keramik 20/25 Pasir Pasang Semen PC Semen Warna
II. II.1. II.2. II.3.
PERALATAN
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.050 0.018 0.186 1.940
HARGA SATUAN (Rp.)
VOLUME
13.00 1.00 2.00 23.00
I.8 ADD - Pek. Pas. Dinding Keramik 20x25 GAMBAR RENCANA 12.00 M2
dos m3 sak kg
TOTAL (Rp.)
65,500 151,300 57,900 15,000 SUB TOTAL I
851,500 151,300 115,800 345,000 1,463,600
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala Tukang
0.300 0.250 0.090
4.00 3.00 1.00
hari hari hari
-
75,000 110,900 100,000 SUB TOTAL III
300,000.00 332,700.00 100,000.00 732,700
TOTAL
2,196,300
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa Usulan Kegiatan
NO
: : : : :
SULAWESI SELATAN GOWA kajang POSSI TANAH PEMB. TOILET KANTOR
U R A I A N
I. I.1. I.2. I.3. I.4.
B A H A N Tegel keramik 20/20 Pasir Pasang Semen PC Semen Warna
II. II.1. II.2. II.3.
PERALATAN
No. RAB Program
: : Jenis Kegiatan : Ukuran/Dimensi : Volume :
KOEF.
1.050 0.010 0.010 0.100
HARGA SATUAN (Rp.)
VOLUME
8.00 1.00 1.00 1.00
I.9 ADD - Pek. Pas. Lantai Keramik 20x20 GAMBAR RENCANA 7.50 M2
dos m3 sak kg
TOTAL (Rp.)
59,000 151,300 57,900 15,000 SUB TOTAL I
472,000 151,300 57,900 15,000 696,200
SUB TOTAL II III. III.1. III.2. III.3.
U P A H Pekerja Tukang Batu Kepala Tukang
0.300 0.150 0.015
3.00 1.00 1.00
hari hari hari
-
75,000 110,900 100,000 SUB TOTAL III
225,000.00 110,900.00 100,000.00 435,900
TOTAL
1,132,100
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan Desa
: SULAWESI SELATAN : GOWA : PEMB. TOILET KANTOR : $0.00
No. RAB Program
: $0.00 : ADD Jenis Kegiatan : - Pekerjaan kolom Ukuran/Dimensi : GAMBAR RENCANA
Usulan Kegiatan
NO
:
$0.00
U R A I A N
I. I.1 I.2 I.3 I.4 I.5 I.6 I.7 I.8
B A H A N Kayu terentang Paku biasa 2' -5' Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir Beton Kerikil
II. II.1. II.2. II.3.
PERALATAN
Volume
KOEF.
0.220 3.200 1.600 150.000 2.250 6.720 0.540 0.810
0.30 M3 HARGA SATUAN (Rp.)
VOLUME
0.07 0.97 0.49 45.56 0.68 2.04 0.16 0.25
:
M³ Kg Ltr Kg Kg Sak M3 M3
TOTAL (Rp.)
33,000 75,000 100,000 100,000 SUB TOTAL I
16,038.00 3,417,187.50 68,343.75 204,120.00 3,705,689.25
SUB TOTAL II III. III.1 III.2 III.3 III.4 III.5
U P A H Pekerja Tukang batu Tukang Kayu Tukang besi Kepala Tukang
0.300 1.050 1.050 3.050 0.010
1.00 0.32 0.32 0.93 0.00
0.000 bh Oh Oh Oh
-
29,700 75,000 100,000 100,000 SUB TOTAL III
9,472 23,920 92,644 304 126,340
TOTAL
3,832,030
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
RENCANA ANGGARAN BIAYA PRASARANA Propinsi Kabupaten Kecamatan
: SULAWESI SELATAN : GOWA : $0.00
No. RAB Program
: $0.00 : ADD Jenis Kegiatan : - Pekerjaan ringbalk
Desa Usulan Kegiatan
NO
: :
$0.00 $0.00
U R A I A N
I. I.1 I.2 I.3 I.4 I.5 I.6 I.7 I.8
B A H A N Kayu terentang Paku biasa 2' -5' Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir Beton Kerikil
II. II.1. II.2. II.3.
PERALATAN
Ukuran/Dimensi
Volume
KOEF.
0.220 3.200 1.600 150.000 2.250 6.720 0.540 0.810
HARGA SATUAN (Rp.)
VOLUME
0.04 0.65 0.32 30.38 0.46 1.36 0.11 0.16
: GAMBAR RENCANA : 0.20 M3
M³ Kg Ltr Kg Kg Sak M3 M3
TOTAL (Rp.)
100,000 27,000 75,000 100,000 100,000 SUB TOTAL I
4,455.00 12,301.88 102,060.00 10,935.00 16,402.50 146,154.38
SUB TOTAL II III. III.1 III.2 III.3 III.4 III.5
U P A H Pekerja Tukang batu Tukang Kayu Tukang besi Kepala Tukang
0.300 1.050 1.050 3.050 0.010
0.06 0.21 0.21 0.62 0.00
OH OH OH OH OH
-
495,000 450,000 SUB TOTAL III
305,724 911 306,636
TOTAL
452,790
Pannyangkalang, ……………..2016
Propinsi Kabupaten Kecamatan Desa
Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
: SULAWESI SELATAN : GOWA : $0.00 : $0.00
No. RAB Program
: $0.00 : ADD Jenis Kegiatan : - beton bertulang Ukuran/Dimensi : GAMBAR RENCANA
Usulan Kegiatan
NO
:
$0.00
U R A I A N
I. I.1 I.2 I.3 I.4 I.5 I.6 I.7 I.8
B A H A N Trikles Paku biasa 2' -5' Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir Beton Kerikil
II. II.1. II.2. II.3.
PERALATAN
Volume
KOEF.
0.220 3.200 1.600 150.000 2.250 6.720 0.540 0.810
2.60 HARGA SATUAN (Rp.)
VOLUME
0.57 8.32 4.16 390.00 5.85 17.47 1.40 2.11
:
kg Oh Oh Oh kg kg kg m3
13,700 13,700 75,000 100,000 100,000 SUB TOTAL I
TOTAL (Rp.)
56,992.00 5,343,000.00 438,750.00 1,747,200.00 140,400.00 7,726,342.00
SUB TOTAL II III. III.1 III.2 III.3 III.4 III.5
U P A H Pekerja Tukang batu Tukang Kayu Tukang besi Kepala Tukang
0.300 1.050 1.050 3.050 0.010
0.78 2.73 2.73 7.93 0.03
0.000 0.000 0.000 dos m3
-
10,000 11,000 12,000 SUB TOTAL III
TOTAL
27,300 87,230 312 114,842
7,841,184
Pannyangkalang, ……………..2016 Disetujui Oleh
Dibuat Oleh,
Kepala Desa Pannyangkalang
Kader Teknik Desa Pannyangkalang
Jenis Prasarana : PEMB. TOILET umum Desa : batunilamung Kecamatan : KAJANG Kabupaten : BULUKUMBA
PERHITUNGAN VOLUME
URAIAN PEKERJAAN DAN HITUNGAN VOLUME
- Pek. Galian Tanah Pondasi Garis & Bt. Bata =
12.50
x
0.25
x
- Pek. Pas. Dinding Keramik 20x25
0.45
=
1.41 M3
=
total
=
1.41 M 3
- Pek. Pas. Lantai Keramik 20x20
- Pek. Pasangan Pondasi Batu Gunung 0.25
+
0.45
2.00 =
0.16
x
x
=
0.45
12.50
2.00
:
=
2.00 M 3
12.50
x
3.000
0.15
=
0.67 M 3
0.15
x
x
0.25
=
0.47 M 3
0.15
12.50
x
2.25
=
0.30 M 3
x
2.25
=
28.13 M 2
- Pek. Plesteran Dinding Trassaram =
28.13
x
2.25
=
28.13
=
56.25 M 2
- Pek. Pas. Kloset Jongkok
=
2.00 bh
- Pek. Pas. Septick Tank
=
- Pek. Pas. Engsel Pintu
=
=
1.00
=
7.50 M 2
M3
- Pas. Listplank Calcyboard
=
- Pek. Cat Atap Seng
x
3.00 0.20 =
3.00
4.00
2.00
x
3.00
=
=
0.15
x
0.15
x
9.00
=
0.20 M 3
- Pek. Pipa Air Bersih Ø 3/4"
=
3.00 M
- Pek. Pipa Air Kotor Ø 4"
=
3.00 bt
- Pek. Pas. Pintu Aluminium
=
2.00 unit
- Pek. Pas. Grendel Pintu
=
2.00 bh
- Pek. Pas. Kran Air
=
8.00 bh
- Pek. Pas. Floor Drain
=
2.00 bh
=
0.80
63.28 M 2
- Pek. Acian Semen Dilicin
- beton bertulang
x
12.00 M 2
- Pekerjaan ringbalk
- Pek. Pas. Dinding Bata Trassaram =
2.50
=
- Pek. Bubungan Atap Seng
- Pekerjaan kolom =
x
1.00
- Pas. Atap Seng
- Pekerjaan Sloef Beton 15/20 =
3.00
x
=
- Pekerjaan Urugan Tanah =
12.00
unit
pek. Beton bertulang
2.00 bh
2.00
x
2.00
0.20
1.80 12.00 M 2 =
Pannyangkalang, ……………..2016 Dibuat Oleh, Kader Teknik Desa Pannyangkalang
Disetujui Oleh Kepala Desa Pannyangkalang
TAJUDDIN, S.IP, M.Si
HADIAH
Jenis Prasarana : Desa : Kecamatan : Kabupaten :
PERHITUNGAN VOLUME URAIAN PEKERJAAN DAN HITUNGAN VOLUME
- Pek. Galian Tanah Pondasi Garis & Bt. Bata = 2.00 x 2.00 x 2.00 = 8.00 M3 total = 8.00 M 3
M2 M2
=
- M3
= #DIV/0! M 3
- Pekerjaan Sloef Beton 15/20 = 2.00 x 0.15 x 0.25 - Pekerjaan kolom = x 3.00 - Pek. Pas. Dinding Bata Trassaram = 8.00 x 2.00 - Pek. Plesteran Dinding Trassaram = 16.00 x 1.00
=
0.08 M 3
=
- M3
=
16.00 M 2
=
16.00 M 2
DAFTAR ANALISA SATUAN PEKERJAAN DAN UPAH No.
01.
02.
03.
04.
05.
18.
Harga Satuan
Uraian
Rupiah
1 M³ Galian Tanah biasa sedalam 1 Meter 0.5500 OH
Pekerja
@Rp.
75,000.00
0.0100 OH
Kepala Kelompok
@Rp.
100,000.00
1.2000 M³
Pasir Urug
@Rp.
254,000.00
0.3000 OH
Pekerja
@Rp.
75,000.00
0.0100 OH
Kepala Kelompok
@Rp.
100,000.00
1 M³ Urugan Pasir
1 M³ Urugan Tanah Kembali 0.3500 OH
Pekerja
@Rp.
75,000.00
0.0100 OH
Kepala Kelompok
@Rp.
100,000.00
1.2000 M³
Tanah Timbunan
@Rp.
143,000.00
0.1000 OH
Pekerja
@Rp.
75,000.00
0.0100 OH
Kepala Kelompok
@Rp.
100,000.00
1 M³ Urugan Tanah
1 M³ Pasang Pondasi Batu Gunung 1 Pc : 4 Ps 1.2000 M³
Batu Gunung
@Rp.
147,200.00
3.2600 sak
Semen Portland
@Rp.
57,900.00
0.5200 M³
Pasir Pasangan
@Rp.
151,300.00
0.3000 OH
Pekerja
@Rp.
75,000.00
0.6000 OH
Tukang Batu
@Rp.
110,900.00
0.0220 OH
Kepala Kelompok
@Rp.
100,000.00
1 M³ Membuat beton tumbuk 1Pc : 3Ps : 5Kr 4.0000 Zak
Semen portland
@Rp.
57,900.00
0.5220 M³
Pasir beton
@Rp.
148,500.00
0.8620 M³
Kerikil
@Rp.
253,000.00
1.0000 OH 0.2200 OH
Pekerja
@Rp.
75,000.00
Tukang batu
@Rp.
110,900.00
0.0220 OH
Kepala Kelompok
@Rp.
100,000.00
43
No.
21.
06.
Rupiah
1 M³ Membuat beton bertulang (150 Kg + bekisting) 0.220 M³
Kayu terentang
@Rp.
2,182,000.00
3.200 Kg
Paku biasa 2' -5'
@Rp.
18,000.00
1.600 Ltr
Minyak bekisting
@Rp.
45,000.00
150.000 Kg
Besi beton polos
@Rp.
14,300.00
2.250 Kg
Kawat beton
@Rp.
24,800.00
6.720 Sak
Semen portland
@Rp.
57,900.00
0.540 M3
Pasir Beton
@Rp.
148,500.00
0.810 M3
Kerikil
@Rp.
253,000.00
0.300 OH
Pekerja
@Rp.
90,900.00
1.050 OH
Tukang batu
@Rp.
110,900.00
1.050 OH
Tukang Kayu
@Rp.
110,900.00
3.050 OH
Tukang besi
@Rp.
110,900.00
0.010 OH
Kepala Tukang
@Rp.
100,000.00
Bata Merah
@Rp.
600.00
0.286 Sak
Semen Portland
@Rp.
57,900.00
0.040 M³
Pasir Pasang
@Rp.
151,300.00
0.220 OH
Pekerja
@Rp.
90,900.00
0.100 OH
Tukang Batu
@Rp.
110,900.00
0.010 OH
Kepala Tukang
@Rp.
100,000.00
0.065 sak
Semen PC
@Rp.
72,500.00
0.100 hari
Pekerja
@Rp.
90,900.00
0.010 hari
Tukang Batu Kepala Tukang
@Rp.
110,900.00
@Rp.
115,900.00
1 M2 Pasang Batu Bata 1/2 bata 1 Pc : 3 Ps (Trassram) 70.000 Bh
07.
Harga Satuan
Uraian
10 m2 Acian Tembok
0.010 hari
1 M2 ACIAN TEMBOK 17.
1 M² Plesteran Tebal 15 mm 1 Pc : 3 Ps 0.1555 Sak
Semen Portland
@Rp.
57,900.00
0.0230 M³
Pasir Pasangan
@Rp.
151,300.00 44
No.
09.
10.
Pekerja
@Rp.
75,000.00
0.1500 OH
Tukang Batu
@Rp.
110,900.00
0.0150 OH
Kepala Kelompok
@Rp.
100,000.00
1 M2 Pas. Keramik 40/40 1.050 dos
Keramik Putih 40/40
@Rp.
67,500.00
0.045 m3
Pasir Pasang
@Rp.
151,300.00
0.164 sak
Semen PC
@Rp.
57,900.00
0.500 kg
Semen Warna
@Rp.
15,000.00
0.150 hari
@Rp.
110,900.00
0.010 hari
Tukang Batu Kepala Tukang
@Rp.
100,000.00
0.300 hari
Pekerja
@Rp.
90,900.00
1.050 dos
Tegel keramik 20/20
@Rp.
59,000.00
0.045 m3
Pasir Pasang
@Rp.
151,300.00
0.208 sak
Semen PC
@Rp.
57,900.00
0.500 kg
Semen Warna
@Rp.
15,000.00
0.300 hari
Pekerja
@Rp.
75,000.00
0.150 hari
Tukang Batu Kepala Tukang
@Rp.
110,900.00
@Rp.
100,000.00
1 M2 Pas. Keramik 20/20
1 M2 Pas. Dinding Keramik 20/25 1.050 dos
Keramik 20/25
@Rp.
65,500.00
0.018 m3
Pasir Pasang
@Rp.
151,300.00
0.186 sak
Semen PC
@Rp.
57,900.00
1.940 kg
Semen Warna
@Rp.
15,000.00
0.300 hari
Pekerja
@Rp.
75,000.00
0.250 hari
Tukang Batu Kepala Tukang
@Rp.
110,900.00
@Rp.
100,000.00
@Rp. @Rp.
82,500.00 148,500.00
0.090 hari
20.
Rupiah
0.2000 OH
0.015 hari
08.
Harga Satuan
Uraian
1 M2 Pemasangan Paving Blok 1.010 M2 0.100 M3
Paving Block Pasir Beton
45
No.
Harga Satuan
Uraian
0.500 Oh 0.250 Oh 0.010 Oh
Pekerja Tukang Batu Kepala Tukang
Rupiah
@Rp. @Rp. @Rp. Peralatan 10%
75,000.00 110,900.00 100,000.00 16,440.00
1 M2 Pemasangan Langit - langit Gypsum 0.364 lembar Gypsum Board 0.110 kg Paku Skrup 0.100 Oh Pekerja 0.050 Oh Tukang 0.010 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
66,000.00 60,000.00 75,000.00 110,900.00 100,000.00
1 M2 Pemasangan Rangka Besi Aluminium Plafond 4.000 M1 Rangka Besi Aluminium Hollow 1.000 Ls Assesoris 0.350 Oh Pekerja 0.350 Oh Tukang 0.053 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
7,500.00 7,500.00 75,000.00 110,900.00 100,000.00
1 M2 Pemasangan List Plafond Gypsum 1.050 M1 List Kayu Profil 0.010 Kg Paku 0.050 Oh Pekerja 0.050 Oh Tukang 0.000 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
6,250.00 18,000.00 75,000.00 110,900.00 100,000.00
1 M2 Pemasangan Rangka Atap Baja Ringan 4.000 M Baja Ringan 75.75 dan 75.100 3.000 M Baja Ringan TS.40 0.350 Oh Pekerja 0.150 Oh Tukang 0.015 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
14,000 6,000 75,000 110,900 100,000
1 M2 Pemasangan Atap Spandeks 1.250 M Atap Spandeks
@Rp.
55,000 46
No.
Harga Satuan
Uraian
0.020 0.120 0.060 0.006
Kg Oh Oh Oh
Baut Spandeks Pekerja
@Rp. @Rp. @Rp. @Rp.
100,000 75,000 110,900 100,000
@Rp.
38,000
@Rp.
100,000
Pekerja
@Rp.
75,000
Tukang Kepala Tukang
@Rp.
110,900
@Rp.
100,000
Tukang Kepala Tukang
1 M2 Pemasangan Nok Spandek 1.000 M Bubungan Spandek 6.000 Bh Baut 0.200 OH 0.100 OH 0.010 OH
Rupiah
1 M2 Pemasangan Rangka Atap Canopy 0.950 Btg
Besi Hollow 40.40.2
@Rp.
148,200
2.000 Bh
Dynabolt Ø 12
@Rp.
3,000.00
2.000 BH
Mur/Baut Ø 12
@Rp.
1,600.00
3.000 Btg
Kawat Las LB. 52
@Rp.
5,100.00
1.000 Set
Perlengkapan Las
@Rp.
65,000.00
0.300 Oh 0.300 Oh 0.012 Oh
Tukang Las Pekerja Kepala Tukang
@Rp. @Rp. @Rp.
75,000.00 100,000.00 100,000.00
1 M' Pasang Listplank Calcyboard 1.100 m Papan Calcyboard 0.060 kg Paku biasa 2" - 5" 0.100 hari Pekerja 0.100 hari Tukang 0.010 hari Kepala tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
27,000.00 18,000.00 75,000.00 100,000.00 100,000.00
1 M' Pasang Pipa Galvanis Diameter 2" 1.200 m Pipa Galvanis 2" 0.350 % Perlengkapan Pipa Galvanis 0.135 hari Pekerja 0.225 hari Tukang 0.023 hari Kepala tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
28,333.33 130,000.00 75,000.00 100,000.00 100,000.00 47
No.
12.
13.
Harga Satuan
Uraian
Rupiah
1 M3 Kusen Pintu & Jendela Kayu Kls. I 1.100 m3 Balok Kayu Kls. I 1.250 kg Paku 10 cm 1.000 kg Lem Kayu 7.000 hari Pekerja 21.000 hari Tukang Kayu 2.100 hari Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp. @Rp.
13,100,000.00 17,000.00 28,000.00 75,000.00 100,000.00 100,000.00
1 M2 Daun Pintu Panil Kayu Kls. I 0.040 m3 Papan Kayu Kls I 0.500 kg Lem Kayu 1.000 hari Pekerja 1.000 hari Tukang Kayu 0.300 hari Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
15,000,000.00 28,000.00 75,000.00 100,000.00 100,000.00
1 M2 Daun Pintu Jendela Kaca Kayu Kelas I 0.024 m3 Papan Kayu Kls I 0.500 kg Lem Kayu 0.800 hari Pekerja 2.400 hari Tukang Kayu 0.240 hari Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
15,000,000.00 28,000.00 75,000.00 100,000.00 100,000.00
1 M2 Pintu dan Jendela Jalusi Kayu Kelas I 0.064 m3 Papan Kayu Kls I 0.500 kg Lem Kayu 1.000 hari Pekerja 3.000 hari Tukang Kayu 0.300 hari Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
15,000,000.00 28,000.00 75,000.00 100,000.00 100,000.00
1 m2 Pasang Pintu / Jendela Besi Pengaman 1.4167 Btg Besi Hollow 40.40.0.7 2.1000 Btg Besi Hollow 20.40.0.7 6.000 Btg Kawat Las LB. 52 1.000 Set Perlengkapan Las 1.2000 Oh Tukang Las 1.2000 Oh Pekerja
@Rp. @Rp. @Rp. @Rp. @Rp. @Rp.
148,200.00 118,800.00 5,100.00 65,000.00 100,000.00 75,000.00 48
No.
Harga Satuan
Uraian
0.0120 Oh
Kepala Tukang
Rupiah
@Rp.
100,000.00
1 m2 Pasang Kaca Tebal 5 mm 1.1000 M2 Kaca tebal 5 mm 0.0500 M Sealant 0.0150 Oh Pekerja 0.1500 Oh Tukang Kayu 0.0150 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
150,000.00 Err:509 75,000.00 100,000.00 100,000.00
1 m2 Pengecatan Tembok Baru ( 1P:1CD:2 ) 0.1000 Kg Plamuur 0.1000 Kg Cat Dasar Tembok 0.2600 Kg Cat Penutup Tembok 0.0300 Bh Kuas 4" 0.0200 Oh Pekerja 0.0630 Oh Tukang Cat 0.0063 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp. @Rp. @Rp.
30,500.00 20,320.00 22,700.00 15,000.00 75,000.00 100,000.00 100,000.00
1 m2 Pengecatan Kayu Baru ( 1P:1CD:2 ) 0.2000 Kg Cat Menie 0.1500 Kg Plamuur 0.1700 Kg Cat Dasar Kayu 0.2600 Kg Cat Penutup Kayu 0.0100 Bh Kuas 2" 0.0300 Kg Pengencer 0.2000 Lbr Ampelas 0.0700 Oh Pekerja 0.0090 Oh Tukang Cat 0.0060 Oh Kepala Tukang
@Rp. @Rp. @Rp. @Rp. @Rp. @Rp. @Rp. @Rp. @Rp. @Rp.
35,000.00 30,500.00 85,000.00 85,000.00 12,500.00 29,000.00 3,500.00 75,000.00 100,000.00 100,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 30,300.00 3,500.00 85,000.00 12,500.00 75,000.00
1 M2 Cat Besi 0.2000 Kg 0.2500 Kg 0.2000 Lbr 0.2500 Kg 0.0750 Bh 0.1000 Oh
Cat Meni Dempul Kayu Kertas Gosok Cat Besi Kuas 2" Pekerja
49
No.
Harga Satuan
Uraian
0.2100 Oh 0.0100 Oh
Rupiah
@ Rp @ Rp
100,000.00 100,000.00
@Rp. @Rp. @Rp. @Rp. @Rp. @Rp. @Rp.
22,700.00 20,320.00 30,500.00 15,000.00 100,000.00 100,000.00 75,000.00
1 Bh Pasang Kunci Pintu 1.000 bh Kunci Tanam Biasa 0.010 Oh Pekerja 0.500 Oh Tukang Kayu 0.050 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp.
130,000.00 75,000.00 100,000.00 100,000.00
1 Bh Pasang Engsel Pintu 1.000 bh Engsel Pintu 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp.
33,000.00 75,000.00 100,000.00 100,000.00
1 Bh Pasang Engsel Jendela 1.000 bh Engsel Jendela 0.010 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp.
29,700.00 75,000.00 100,000.00 100,000.00
1 Bh Pasang Hak Angin 1.000 bh Kait Angin 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp.
8,000.00 75,000.00 100,000.00 100,000.00
Tukang Cat Kepala Tukang
1 M 2 Mengecat Listplank 0.260 kg Cat Penutup Tembok 0.100 kg Cat Dasar Tembok 0.100 kg Plamur 1.000 Bh Kuas 4" Tukang Cat 0.063 hari 0.006 hari 0.020 hari
Kepala Tukang Pekerja
50
No.
Harga Satuan
Uraian
Rupiah
1 Bh Pasang Grendel Jendela 1.000 bh
Grendel Pintu
@Rp.
16,500.00
0.015 Oh
Pekerja
@Rp.
75,000.00
0.150 Oh
Tukang Kayu
@Rp.
100,000.00
0.015 Oh
Kepala tukang
@Rp.
100,000.00
1.000 Bh
Kran Air
@Rp.
22,000.00
0.025 Bh
Sealtape
@Rp.
5,000.00
0.010 Oh
Pekerja
@Rp.
75,000.00
0.400 Oh
Tukang Batu
@Rp.
100,000.00
0.040 Oh
Kepala tukang
@Rp.
100,000.00
1 Bh Pasang Kran Air
1 Bh PasangCloset Duduk 1.000 Bh
Closet Duduk
@Rp.
1,732,800.00
0.060 Bh
Perlengkapan Closet Duduk
@Rp.
1,732,800.00
3.300 Oh
Pekerja
@Rp.
75,000.00
1.100 Oh
Tukang Batu
@Rp.
100,000.00
0.010 Oh
Kepala tukang
@Rp.
100,000.00
1 Bh Pasang Floor Drain 1.000 Bh
Floor Drain
@Rp.
27,000.00
0.010 Oh
Pekerja
@Rp.
75,000.00
0.100 Oh
Tukang Batu
@Rp.
100,000.00
0.010 Oh
Kepala tukang
@Rp.
100,000.00
1 Bh Pasang Bak Cuci Piring Stainless Steel 1.000 Bh
Bak Cuci Piring
@Rp.
495,000.00
1.000 Bh 0.030 Oh 0.300 Oh 0.030 Oh
Water drain Pekerja Tukang Batu Kepala tukang
@Rp.
450,000.00
@Rp. @Rp. @Rp.
75,000.00 100,000.00 100,000.00
51
No.
33.
Harga Satuan
Uraian
Rupiah
1 M PAS. PIPA PVC AW Ø ¾" 1.20 btg Pipa PVC Ø 3/4 " 0.35 ls Perlengkapan Pipa Air Bersih 0.04 Oh Pekerja 0.06 Oh Tukang Batu 0.01 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
50,000.00 50,000.00 75,000.00 100,000.00 100,000.00
1 M PAS. PIPA PVC AW Ø 3" 1.20 btg Pipa PVC Ø 3 " 0.35 ls Perlengkapan Pipa 3" 0.08 Oh Pekerja 0.14 Oh Tukang Batu 0.01 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
100,000.00 100,000.00 75,000.00 100,000.00 100,000.00
1 M PAS. PIPA PVC AW Ø 2 1/2" 1.20 m Pipa PVC Ø 2 1/2 " 0.35 ls Perlengkapann Pipa 2 1/2" 0.05 Oh Pekerja 0.09 Oh Tukang Batu 0.01 Oh Kepala tukang
@Rp. @Rp. @Rp. @Rp. @Rp.
16,600.00 16,600.00 75,000.00 100,000.00 100,000.00
1 M PAS. PIPA PVC AW Ø 2" 1.20 m Pipa PVC Ø 2 " 0.35 ls Perlengkapan Pipa 2" 0.05 Oh Pekerja
@Rp. @Rp. @Rp.
13,700.00 13,700.00 75,000.00
Tukang Batu Kepala tukang
@Rp.
100,000.00
@Rp.
100,000.00
Pipa Listrik
@Rp.
10,000.00
24.00 m
Kabel
@Rp.
11,000.00
3.00 bh
T Dus
@Rp.
12,000.00
4.00 bh
L Bow
@Rp.
17,300.00
3.00 bh
Las Dop
@Rp.
3,500.00
Klem
@Rp.
200.00
Mongkok
@Rp.
17,300.00
0.09 Oh 0.01 Oh
1 M PAS. Titik Lampu 3.00 Btg
24.00 bh 1.00 bh
52
No.
Harga Satuan
Uraian
Rupiah
1.00 bh
Saklar
@Rp.
27,700.00
1.00 bh
Fitting
@Rp.
17,300.00
1.00 Oh
Pekerja Listrik
@Rp.
90,900.00
Pipa Listrik
@Rp.
10,000.00
15.00 m
Kabel
@Rp.
11,000.00
1.00 bh
T Dus
@Rp.
12,000.00
2.00 bh
L Bow
@Rp.
17,300.00
24.00 bh
Klem
@Rp.
200.00
1.00 bh
MCB
@Rp.
67,800.00
1.00 Oh
Pekerja Listrik
@Rp.
90,900.00
1 M PAS. MCB 3.00 Btg
1 TITIK PASANG STOP KONTAK 1.0000
Bh
Stop Kontak
@ Rp
27,800.00
1.0000
Oh
Pekerja Listrik
@ Rp
90,900.00
1 TITIK PASANG SAKLAR TUNGGAL 1.0000
Bh
Saklar Tunggal
@ Rp
27,700.00
1.0000
Oh
Pekerja Listrik
@ Rp
90,900.00
1 TITIK PASANG SAKLAR GANDA 1.0000
Bh
Saklar Ganda
@ Rp
35,500.00
1.0000
Oh
Pekerja Listrik
@ Rp
90,900.00
Lampu SL 45 Watt
@ Rp
63,600.00
Lampu SL 23 Watt
@ Rp
63,600.00
1 TITIK PASANG Lampu SL 45 Watt 1.0000
Bh
1 TITIK PASANG Lampu SL 23 Watt 1.0000
Bh
1 UNIT SEPTICKTANK DAN PERESAPAN 53
No.
Harga Satuan
Uraian
4.500 9.750 0.750 0.360 0.750 9.750 1.500 0.180 9.750 1.000 0.750 4.000
M3 M2 M3 M3 M3 M2 M2 M3 M2 Ls M3 M'
Galian Tanah Pas. Trasram Pasir Urug Kolom, Sloef dan Balok Urugan Kembali Plester Trasram Ijuk Plat Beton Acian Semen Licin Pipa Penghawaan Krikil PVC Dia 4" (D)
Rupiah
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
41,210.00 93,316.25 170,850.00 1,500,000.00 15,045.00 35,583.00 23,775.00 2,908,506.70 10,806.93 35,000.00 2,000.00 167,500.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1 M3 Pemasangan Konstruksi Gording Kayu Kelas II 1.100 M3
Balok Kayu Kelas II
@Rp.
3,160,000
Besi Strip tebal 5 mm
@Rp.
12,000
3.000 Kg
Paku 12 cm
@Rp.
17,000
6.700 Oh
Pekerja
@Rp.
75,000
Tukang Kayu
@Rp.
100,000
Kepala Tukang
@Rp.
100,000
15.000 Kg
20.100 Oh 2.010 Oh
1 M2 Pemasangan Atap Seng Gelombang 0.700 Lbr
Seng Gelombang 3" x 6"
@Rp.
83,400
0.020 Kg
Paku Seng
@Rp.
30,000
0.120 Oh
Pekerja
@Rp.
75,000
0.060 Oh
Tukang
@Rp.
100,000
0.006 Oh
Kepala Tukang
@Rp.
100,000
1 M3 Pemasangan Konstruksi Kuda - Kuda Kayu Konvensional Kelas I, II, III 1.100 M3
Balok Kayu Kelas II
@Rp.
3,160,000
Besi Strip tebal 5 mm
@Rp.
12,000
5.600 Kg
Paku 12 cm
@Rp.
17,000
4.000 Oh
Pekerja
@Rp.
75,000
15.000 Kg
54
No.
Harga Satuan
Uraian
12.000 Oh 1.200 Oh
Tukang Kayu
@Rp.
100,000
Kepala Tukang
@Rp.
100,000
@Rp.
61,000
@Rp.
30,000
Pekerja
@Rp.
75,000
Tukang Kepala Tukang
@Rp.
100,000
@Rp.
100,000
1 M2 Pemasangan Nok Atap Seng Gelombang 0.300 Lbr Seng Pelat 3" x 6" Bjls 35 0.040 Kg Paku Seng 0.150 Oh 0.070 Oh 0.007 Oh
Rupiah
1 Bh Pasang Closet Jongkok Porselen 1.000 Unit
Closet Jongkok
@Rp.
300,000.00
0.120 Sak
Semen Portland
@Rp.
72,000.00
0.010 M3
Pasir Pasang
@Rp.
151,300.00
1.000 Oh
Pekerja
@Rp.
75,000.00
1.500 Oh
Tukang Batu
@Rp.
100,000.00
0.150 Oh
Kepala tukang
@Rp.
100,000.00
55
SA SATUAN PEKERJAAN DAN UPAH Jumlah Harga Rupiah
Rp.
41,250.00
Rp.
1,000.00
Rp.
42,250.00
Rp.
304,800.00
Rp.
22,500.00
Rp.
1,000.00
Rp.
328,300.00
Rp.
26,250.00
Rp.
1,000.00
Rp.
27,250.00
Rp.
171,600.00
Rp.
7,500.00
Rp.
1,000.00
Rp.
180,100.00
Rp.
176,640.00
Rp.
188,754.00
Rp.
78,676.00
Rp.
22,500.00
Rp.
66,540.00
Rp.
2,200.00
Rp.
535,310.00
Rp.
231,600.00
Rp.
77,517.00
Rp.
218,086.00
Rp.
75,000.00
Rp.
24,398.00
Rp.
2,200.00
Rp.
628,801.00 56
Jumlah Harga Rupiah
Rp.
480,040.00
Rp.
57,600.00
Rp.
72,000.00
Rp.
2,145,000.00
Rp.
55,800.00
Rp.
389,088.00
Rp.
80,190.00
Rp.
204,930.00
Rp.
27,270.00
Rp.
116,445.00
Rp.
116,445.00
Rp.
338,245.00
Rp.
1,000.00
Rp.
4,084,053.00
Rp.
42,000.00
Rp.
16,559.40
Rp.
6,052.00
Rp.
19,998.00
Rp.
11,090.00
Rp.
1,000.00
Rp.
96,699.40
Rp.
4,712.50
Rp.
9,090.00
Rp.
1,109.00
Rp.
1,159.00
Rp.
16,070.500
Rp.
1,607.050
Rp.
9,004.61
Rp.
3,479.90 57
Jumlah Harga Rupiah
Rp.
15,000.00
Rp.
16,635.00
Rp.
1,500.00
Rp.
45,619.51
Rp.
70,875.00
Rp.
6,808.50
Rp.
9,484.02
Rp.
7,500.00
Rp.
16,635.00
Rp.
1,000.00
Rp.
27,270.00
Rp.
139,572.52
Rp.
61,950.00
Rp.
6,808.50
Rp.
12,043.20
Rp.
7,500.00
Rp.
11,250.00
Rp.
1,663.50
Rp.
30,000.00
Rp.
131,215.20
Rp.
68,775.00
Rp.
2,723.40
Rp.
10,769.40
Rp.
29,100.00
Rp.
18,750.00
Rp.
9,981.00
Rp.
30,000.00
Rp.
170,098.80
Rp. Rp.
83,325.00 14,850.00 58
Jumlah Harga Rupiah
Rp. Rp. Rp. Rp. Rp.
37,500.00 27,725.00 1,000.00 164,400.00 16,440.00 180,840.00
Rp. Rp. Rp. Rp. Rp. Rp.
24,024.00 6,600.00 7,500.00 5,545.00 1,000.00 44,669.00
Rp. Rp. Rp. Rp. Rp. Rp.
30,000.00 7,500.00 26,250.00 38,815.00 5,300.00 107,865.00
Rp. Rp. Rp. Rp. Rp. Rp.
6,562.50 180.00 3,750.00 5,545.00 16,037.50
Rp. Rp. Rp. Rp. Rp. Rp.
56,000.00 18,000.00 26,250.00 16,635.00 1,500.00 118,385.00
Rp.
68,750.00 59
Jumlah Harga Rupiah
Rp. Rp. Rp. Rp.
2,000.00 9,000.00 6,654.00 600.00
Rp.
87,004.00
Rp.
38,000.00
Rp.
600,000.00
Rp.
15,000.00
Rp.
11,090.00
Rp.
1,000.00
Rp.
665,090.00
Rp.
140,790.00
Rp.
6,000.00
Rp.
3,200.00
Rp.
15,300.00
Rp.
65,000.00
Rp. Rp. Rp. Rp.
22,500.00 30,000.00 1,200.00 283,990.00
Rp. Rp. Rp. Rp. Rp. Rp.
29,700.00 1,080.00 7,500.00 10,000.00 1,000.00 49,280.00
Rp. Rp. Rp. Rp. Rp.
34,000.00 45,500.00 10,125.00 22,500.00 2,300.00 60
Jumlah Harga Rupiah
Rp.
114,425.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
82,500.00 125,000.00 100,000.00 700,000.00 2,100,000.00 210,000.00 3,317,500.00
Rp. Rp. Rp. Rp. Rp. Rp.
600,000.00 14,000.00 75,000.00 100,000.00 30,000.00 819,000.00
Rp. Rp. Rp. Rp. Rp. Rp.
360,000.00 14,000.00 60,000.00 240,000.00 24,000.00 698,000.00
Rp. Rp. Rp. Rp. Rp. Rp.
960,000.00 14,000.00 75,000.00 300,000.00 30,000.00 1,379,000.00
Rp. Rp. Rp. Rp. Rp. Rp.
209,950.00 249,480.00 30,600.00 65,000.00 120,000.00 90,000.00 61
Jumlah Harga Rupiah
Rp. Rp.
1,200.00 766,230.00
Rp. Rp. Rp. Rp. Rp. Rp.
165,000.00 Err:509 1,125.00 15,000.00 1,500.00 Err:509
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
3,050.00 2,032.00 5,902.00 450.00 1,500.00 6,300.00 630.00 19,864.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
7,000.00 4,575.00 14,450.00 22,100.00 125.00 870.00 700.00 5,250.00 900.00 600.00 56,570.00
Rp. Rp. Rp. Rp. Rp. Rp.
7,000.00 7,575.00 700.00 21,250.00 937.50 7,500.00 62
Jumlah Harga Rupiah
Rp. Rp. Rp.
21,000.00 1,000.00 51,687.50
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
5,902.00 2,032.00 3,050.00 15,000.00 6,300.00 630.00 1,500.00 34,414.00
Rp. Rp. Rp. Rp. Rp.
130,000.00 750.00 50,000.00 5,000.00 185,750.00
Rp. Rp. Rp. Rp. Rp.
33,000.00 1,125.00 15,000.00 1,500.00 50,625.00
Rp. Rp. Rp. Rp. Rp.
29,700.00 750.00 10,000.00 1,000.00 41,450.00
Rp. Rp. Rp. Rp. Rp.
8,000.00 1,125.00 15,000.00 1,500.00 25,625.00 63
Jumlah Harga Rupiah
Rp.
16,500.00
Rp.
1,125.00
Rp.
15,000.00
Rp.
1,500.00
Rp.
34,125.00
Rp.
22,000.00
Rp.
125.00
Rp.
750.00
Rp.
40,000.00
Rp.
4,000.00
Rp.
66,875.00
Rp.
1,732,800.00
Rp.
103,968.00
Rp.
247,500.00
Rp.
110,000.00
Rp.
1,000.00
Rp.
2,195,268.00
Rp.
27,000.00
Rp.
750.00
Rp.
10,000.00
Rp.
1,000.00
Rp.
38,750.00
Rp.
495,000.00
Rp.
450,000.00
Rp. Rp. Rp. Rp.
2,250.00 30,000.00 3,000.00 980,250.00 64
Jumlah Harga Rupiah
Rp. Rp. Rp. Rp. Rp. Rp.
60,000.00 17,500.00 2,700.00 6,000.00 600.00 86,800.00
Rp. Rp. Rp. Rp. Rp. Rp.
120,000.00 35,000.00 6,075.00 13,500.00 1,350.00 175,925.00
Rp. Rp. Rp. Rp. Rp. Rp.
19,920.00 16,600.00 4,050.00 9,000.00 900.00 50,470.00
Rp. Rp. Rp.
16,440.00 13,700.00 4,050.00
Rp.
9,000.00
Rp.
900.00
Rp.
44,090.00
Rp.
30,000.00
Rp.
11,000.00
Rp.
36,000.00
Rp.
17,300.00
Rp.
10,500.00
Rp.
200.00
Rp.
17,300.00 65
Jumlah Harga Rupiah
Rp.
27,700.00
Rp.
17,300.00
Rp.
90,900.00
Rp.
258,200.00
Rp.
30,000.00
Rp.
11,000.00
Rp.
12,000.00
Rp.
17,300.00
Rp.
200.00
Rp.
67,800.00
Rp.
90,900.00
Rp.
229,200.00
Rp.
27,800.00
Rp.
90,900.00
Rp.
27,800.00
Rp.
27,700.00
Rp.
90,900.00
Rp.
27,700.00
Rp.
35,500.00
Rp.
90,900.00
Rp.
35,500.00
Rp.
63,600.00
Rp.
63,600.00
Rp.
63,600.00
Rp.
63,600.00
66
Jumlah Harga Rupiah
185,400.00 909,800.00 128,100.00 540,000.00 11,300.00 346,900.00 35,700.00 523,500.00 105,400.00 35,000.00 1,500.00 670,000.00 3,492,600.00
Rp.
3,476,000.00
Rp.
180,000.00
Rp.
51,000.00
Rp.
502,500.00
Rp.
2,010,000.00
Rp.
201,000.00
Rp.
6,420,500.00
Rp.
58,380.00
Rp.
600.00
Rp.
9,000.00
Rp.
6,000.00
Rp.
600.00
Rp.
74,580.00
Rp.
3,476,000.00
Rp.
180,000.00
Rp.
95,200.00
Rp.
300,000.00 67
Jumlah Harga Rupiah
Rp.
1,200,000.00
Rp.
120,000.00
Rp.
5,371,200.00
Rp.
18,300.00
Rp.
1,200.00
Rp.
11,250.00
Rp.
7,000.00
Rp.
700.00
Rp.
38,450.00
Rp.
300,000.00
Rp.
8,640.00
Rp.
1,513.00
Rp.
75,000.00
Rp.
150,000.00
Rp.
15,000.00
Rp.
550,153.00
68
DAFTAR HARGA TENAGA KERJA NOMOR / KODE
URAIAN TENAGA KERJA
SATUAN
L-01
Pekerja
Oh
L-02
Tukang batu
Oh
L-03
Tukang Kayu
Oh
L-04
Tukang besi
Oh
L-05
Kepala Tukang
Oh
L-06
Tukang Las
Oh
L-07
Tukang
Oh
L-08
Tukang Cat
Oh
L-09
Pekerja Listrik
Oh
DAFTAR HARGA MATERIAL NOMOR / KODE
URAIAN MATERIAL
SATUAN
M-01
Tanah Timbunan
M3
M-02
Pasir Urug
M3
M-03
Batu Gunung
M3
M-04
Semen Portland
Sak
M-05
Pasir Beton
M3
M-98
Besi Strip t = 5 mm
Kg
M-99
Paku 12 cm
Kg
M-100
Seng Gelombang BJLS 0,35 ( 6 Kaki )
Lbr
M-101
Paku Seng
Kg
M-102
Seng Pelat 3" x 6" Bjls 35
Lbr
M-102
Balok Kayu Kelas II
M3
M-06
Kayu terentang
M3
M-07
Paku biasa 2' -5'
Kg
M-08
Minyak bekisting
Ltr
M-09
besi 10
Kg
69
L-07
Tukang
Oh
L-08
Tukang Cat
Oh
L-09
Pekerja Listrik
Oh
M-10
Kawat beton
Kg
M-11
Kerikil
M3
M-12
Bata Merah
Bh
Pasir Pasangan
M3
M-13
Keramik Putih 40/40
Dos
M-14
Semen Warna
Kg
M-15
Tegel keramik 20/20
Dos
M-16
Keramik 20/25
Dos
M-17
Paving Block
Bh
M-18
Rangka Besi Aluminium Hollow
M
M-19
Assesoris
Set
M-20
Gypsum Board
Lbr
M-21
Paku Skrup
Kg
M-22
List Kayu Profil
M
M-23
Paku
Kg
M-24
Baja Ringan 75.75 dan 75.100
Btg
M-25
Baja Ringan TS.40
M
M-26
Atap Spandeks
M
M-27
Baut Spandeks
Kg
M-28
Bubungan Spandek
M
M-29
Baut
Bh
M-30
Papan Calcyboard
M
M-31
Besi Hollow 40.40.2
Btg
M-32
Besi Hollow 20.40.0.7
Btg
M-33
Dynabolt Ø 12
Bh
M-34
Mur/Baut Ø 12
Bh
M-35
Kawat Las LB. 52
Kg
M-36
Perlengkapan Las
Set
M-37
Pipa Galvanis 2"
M
70
L-07
Tukang
Oh
L-08
Tukang Cat
Oh
L-09
Pekerja Listrik
Oh
M-38
Perlengkapan Pipa Galvanis
Set
M-39
Balok Kayu Kls. I
M3
M-40
Papan Kayu Kls I
M3
M-41
Paku 10 cm
Kg
M-42
Lem Kayu
Kg
M-43
Kaca tebal 5 mm
M2
M-45
Kunci Tanam Biasa
Bh
M-46
Engsel Pintu
Bh
Engsel Jendela
Bh
Kait Angin
Bh
Grendel Pintu
Bh
Kran Air
Bh
Sealtape
Bh
Closet Duduk
Bh
Perlengkapan Closet Duduk
Set
Closet Jongkok "Type CE 6 Ex Toto "
Unit
Floor Drain
BH
Bak Cuci Piring
Bh
Water drain
Bh
Pipa PVC Ø 3/4 "
M
Perlengkapan Pipa Air Bersih
Set
Pipa PVC Ø 2 1/2 "
M
Perlengkapann Pipa 2 1/2"
Set
Pipa PVC Ø 2 "
M
Perlengkapan Pipa 2"
Set
Pipa PVC Ø 3 "
M
Perlengkapan Pipa 3"
Set
Pipa Listrik
Btg
Kabel
M
71
L-07
Tukang
Oh
L-08
Tukang Cat
Oh
L-09
Pekerja Listrik
Oh
T Dus
Bh
L Bow
Bh
Las Dop
Bh
Klem
Bh
Mongkok
Bh
Saklar
Bh
Fitting
Bh
Saklar Ganda
Bh
Saklar Tunggal
Bh
Stop Kontak
Bh
MCB
Bh
Lampu SL 23 Watt
Bh
Plamuur
Kg
Cat Dasar Tembok
Kg
Cat Penutup Tembok
Kg
Cat Menie
Kg
Cat Dasar Kayu
Kg
Cat Penutup Kayu
Kg
Pengencer
Ltr
Dempul Kayu
Kg
Cat Besi
Kg
Linggis
Bh
Sekop
Bh
Ember Cor
Bh
Kuas 4"
Bh
Kuas 2"
Bh
Ampelas
Bh
Tamannyeleng,
Desember 2
72
L-07
Tukang
Oh
L-08
Tukang Cat
Oh
L-09
Pekerja Listrik
Oh
Disetujui Oleh,
Dibuat Oleh
Kepala Desa Tamannyeleng
Kader Teknik Desa Tamannyeleng
......................................
…………………………
box (H) 600 x (W) 500 x (D) 400 mm MCB in 3P, 40A, 10kA MCB out 1P, 6A/10A, 6 kA Pilot light 220 VAC c/w neon bulb & fuse Philips Essential 23w/CD/WW Fitting lampu SL (National) Bare copper, 100A Kabel NYY 4 x 50 mm² Kabel NYA 1 x 2,5 mm
73
DAFTAR HARGA TENAGA KERJA HARGA Rp
75,000
Rp
100,000
Rp
100,000
Rp
100,000
Rp
100,000
Rp
100,000
Rp
100,000
Rp
100,000
Rp
75,000
DAFTAR HARGA MATERIAL HARGA Rp
143,000
Rp
254,000
Rp
254,000
Rp
72,000
Rp
286,000
Rp
12,000
Rp
17,000
Rp
83,400
Rp
30,000
Rp
61,000
Rp
3,160,000
Rp
2,182,000
Rp
18,000
Rp
45,000
Rp
64,000
74
Rp
100,000
Rp
100,000
Rp
75,000
Rp
24,800
Rp
253,000
Rp
700
Rp
151,300
Rp
67,500
Rp
15,000
Rp
59,000
Rp
65,500
Rp
82,500
Rp
7,500
Rp
7,500
Rp
66,000
Rp
60,000
Rp
7,000
Rp
18,000
Rp
14,000
Rp
6,000
Rp
55,000
Rp
100,000
Rp
38,000
Rp
100,000
Rp
27,000
Rp
148,200
Rp
118,800
Rp
3,000
Rp
1,600
Rp
5,100
Rp
65,000
Rp
29,000
75
Rp
100,000
Rp
100,000
Rp
75,000
Rp
130,000
Rp
13,100,000
Rp
15,000,000
Rp
17,000
Rp
28,000
Rp
150,000
Rp
130,000
Rp
33,000
Rp
29,700
Rp
8,000
Rp
16,500
Rp
22,000
Rp
5,000
Rp
1,732,800
Rp
1,732,800
Rp
300,000
Rp
27,000
Rp
495,000
Rp
450,000
Rp
9,500
Rp
9,500
Rp
16,600
Rp
16,600
Rp
13,700
Rp
13,700
Rp
20,900
Rp
20,900
Rp
10,000
Rp
11,000
76
Rp
100,000
Rp
100,000
Rp
75,000
Rp
12,000
Rp
17,300
Rp
3,500
Rp
200
Rp
17,300
Rp
27,700
Rp
17,300
Rp
35,500
Rp
27,700
Rp
27,800
Rp
67,800
Rp
63,600
Rp
30,500
Rp
20,320
Rp
22,700
Rp
35,000
Rp
85,000
Rp
85,000
Rp
29,000
Rp
30,300
Rp
85,000
Rp
75,000
Rp
125,000
Rp
10,000
Rp
15,000
Rp
12,500
Rp
3,500
Tamannyeleng,
Desember 2016
77
Rp
100,000
Rp
100,000
Rp
75,000
Dibuat Oleh Kader Teknik Desa Tamannyeleng
…………………………
Unit Unit Unit Unit bh bh Unit Roll 50m Roll
78