c Prepare the following documents for two or three of the experiments listed below and develop the software engineering methodology. 1. Program Analysis and Project Planning. Thorough study of the problem ± Identify project scope, Objectives, Infrastructure. 2. Software requirement Analysis Describe the individual Phases / Modules of the project, Identify deliverables. 3. Data Modeling Use work products ± Data dictionary, Use diagrams and activity diagrams, build and test lass diagrams, Sequence diagrams and add interface to class diagrams. 4. Software Development and Debugging 5. Software Testing Prepare test plan, perform validation testing, Coverage analysis, memory leaks, develop test case hierarchy, Site check and Site monitor. Suggested List of Applications: 1. Online Examination System 2. Online Shopping System 3. CBCS - Course Registration System 4. Online Ticket Reservation System 5. Payroll System 6. ATM Systems 7. Stock Maintenance System 8. Time ± Tabling System 9. Real-Time Job Scheduler 10. Remote Procedure Call Implementation
Ä c Prepare the following UML diagrams for selected experiments from above list and develop the design documents for the same.
Ä c A few ways to create a new Use Case Diagram Adding Use Case Elements Creating Connections
c A few ways to create a new Use Case Diagram Adding Class Diagram Elements Creating Relationships Adding Attributes Adding Methods Class Specifications
A few ways to create a new System Sequence Diagram Adding System Sequence Diagram Elements ing Messages Creating Loops
Creating a new lifeline from within a lifeline Creating Alternatives
c A few ways to create a new Communication Diagram Adding Communication Diagram Elements Creating Relationships and Messages
c 06-12-2010 13-12-2010 20-12-2010 24-01-2011 31-01-2011
Program Analysis and Project Planning Software requirement Analysis -1 Software requirement Analysis -2 Data Modeling Use Case Diagrams
c 07-02-2011 14-02-2011 21-02-2011 28-02-2011 07-03-2011
Class Diagrams -1 Class Diagrams -2 System Sequence Diagrams Sequence Diagrams Communication Diagrams -1
c 14-03-2011 21-03-2011 28-03-2011 04-04-2011 11-04-2011 18-04-2011
Communication Diagrams -2 Software Development and Debugging Software Testing-1 Software Testing-2 Model Lab Exam Lab Record Submission